BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2025 at 8:00 PM

Updated March 25, 2025

Site work, renovation and addition to a mixed-use development in Fort Worth, Texas. Completed plans call for the renovation of a 409,977-square-foot, 20-story above grade municipal facility; and for the addition of a 25,000-square-foot, two-story above grade municipal facility.

Plans call for the conversion of the former Pier 1 Headquarters Building into a new city hall facility. The existing building is 20-stories and 409,977 square feet. Certain floors are currently occupied and those leases will be honored and work will not begin on those floors at this time. As of March 2025, construction is complete. There is also a separate Chambers project which will be a 25,000 square foot, 2-story building that will be added onto a side of the existing 20-story tower building and used for council meetings and public meetings/gatherings. Please break out pricing for the Tower & Chambers separately. Please direct all inquiries to the construction manager. On behalf of the City of Fort Worth, Linbeck Group, LLC, is requesting proposals for City of Fort Worth Future City Hall - Bid Package #2 (BP-02) Tower & Chambers Mechanical and Electrical RFQ/P. This package is for preconstruction and material procurement. Tower & Chambers will be treated as separate projects. Project located at 100 Energy Way, Fort Worth Tx 76102. The bid carries a 35% City of Fort Worth qualified Business Equity firm participation goal. A best value selection criteria will be used in the evaluation of all proposals. The City of Fort Worth reserves the right to waive any informality and to reject any and all Proposals. Subcontractors must pre-qualify with the construction manager. Addendum #1 has been issued as of 11-1-2022. In case there is any confusion the proposal submission deadline for this package is Wednesday, November 9 at 4:00PM Central. The actual proposal states 2:00PM but Building Connected stated 4:00PM. In light of the confusion the deadline is officially 4:00 PM Central. Please let me know if you have any questions. Thanks, Josh Farmer Estimate = total project construction cost estimate. QC#1 have been issued as of 10-28-2022. QC#2 have been issued as of 11-3-2022. QC#3 has been issued as of 11-4-2022.

Occupancy

Municipal

$50,000,000.00

Public - City

Addition, Renovation, Site Work

102

19

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
405
Active Projects
221
Bidding Soon
3,935
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2022

January 9, 2023

Project location map

100 Pier 1 Pl, Fort Worth, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.