Site work, renovation and addition to a mixed-use development in Fort Worth, Texas. Completed plans call for the addition of a 25,000-square-foot, two-story above grade municipal facility.

Plans call for the construction of a Chambers Building which will be attached to the 20-story tower that is being renovated for the new city hall. The Chambers Building will be a 25,000 square foot 2-story addition to house city council meetings and other public meeting uses. As of March 2025, construction is complete. The construction manager is seeking subcontractor trade pricing for the Chambers Building foundation package. Please direct all inquiries to the construction manager. Subcontractors must pre-qualify with the construction manager. Estimate = total project construction cost estimate. QC #1 has been issued as of 11-7-2022. QC #2 has been issued as of 10-28-2022. QC #3 has been issued as of 11-7-2022. See the attached Q&C #1 that is partially answered. Question #1 has been answered. The planter walls will now be excluded. The piers are still included but the associated walls above will be excluded. Question #2, however, and the pad prep is still being addressed. This message only applies to any interested concrete vendors. The Appendix C - Bid Form & Appendix D - Scope of Work have both been updated to include an allowance for the elevated superstructure. This allowance amount is provided on both forms. Your total base bid amount will include this allowance. After contract award and the elevated superstructure design is ready for pricing the Bidder will reconcile this allowance. Note from CM: There were two clerical errors that came to my attention on the instruction to bidder documents. 1. The MWBE participation % was 60%. This is wrong it should be 50%. 2. The retainage was 5%. This should be 10%. I have revised the ITB documents to reflect these changes. The changes are now in red. For ease I've made a single PDF of all bid documents combined. See attached. One is for concrete the other is for the balance of the bids. I apologize for any confusion this may have provided. Thanks, Josh Farmer (817) 504-4324

Occupancy

Municipal

$50,000,000.00

Public - City

Addition, Renovation, Site Work

37

24

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
405
Active Projects
221
Bidding Soon
3,982
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2022

January 30, 2023

Project location map

100 Pier 1 Pl, Fort Worth, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.