BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, renovation and addition to a mixed-use development in Fort Worth, Texas. Completed plans call for the renovation of a 409,977-square-foot, 20-story above grade municipal facility; and for the addition of a 25,000-square-foot, two-story above grade municipal facility.

Plans call for the conversion of the former Pier 1 Headquarters Building into a new city hall facility. The existing building is 20-stories and 409,977 square feet. Certain floors are currently occupied and those leases will be honored and work will not begin on those floors at this time. The tower started construction January 2023, the Chambers building does not have a firm construction start date, as permits are pending as of April 28, 2023. There is also a separate Chambers project which will be a 25,000 square foot, 2-story building that will be added onto a side of the existing 20-story tower building and used for council meetings and public meetings/gatherings. Please break out pricing for the Tower & Chambers separately. Please direct all inquiries to the construction manager. On behalf of the City of Fort Worth, Linbeck Group, LLC, is requesting proposals for City of Fort Worth Future City Hall - Bid Package #2 (BP-02) Tower & Chambers Mechanical and Electrical RFQ/P. This package is for preconstruction and material procurement. Tower & Chambers will be treated as separate projects. Project located at 100 Energy Way, Fort Worth Tx 76102. The bid carries a 35% City of Fort Worth qualified Business Equity firm participation goal. A best value selection criteria will be used in the evaluation of all proposals. The City of Fort Worth reserves the right to waive any informality and to reject any and all Proposals. Subcontractors must pre-qualify with the construction manager. Addendum #1 has been issued as of 11-1-2022. In case there is any confusion the proposal submission deadline for this package is Wednesday, November 9 at 4:00PM Central. The actual proposal states 2:00PM but Building Connected stated 4:00PM. In light of the confusion the deadline is officially 4:00 PM Central. Please let me know if you have any questions. Thanks, Josh Farmer Estimate = total project construction cost estimate. QC#1 have been issued as of 10-28-2022. QC#2 have been issued as of 11-3-2022. QC#3 has been issued as of 11-4-2022.

Award

Municipal

$50,000,000.00

Public - City

Addition, Renovation, Site Work

102

19

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
62
Bidding Soon
3,510
All Active Projects
1,391
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2022

January 9, 2023

img_map_placeholder

100 Pier 1 Pl, Fort Worth, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.