BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 9, 2024 at 8:00 PM

Updated August 10, 2024

Site work for a water / sewer project in Crystal Lake, Illinois. Completed plans call for site work for a water / sewer project.

The project includes the installation of storm sewer and open ditch drainage improvements, rain gardens, traffic control and protection, surface restoration, and erosion and sediment control measures. The Contractor shall furnish all labor, materials, and equipment required to construct these listed items and all other work items necessary to complete the project.

Award

Water / Sewer

$310,269.00

Public - City

Site Work

25

12

2

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
544
Active Projects
296
Bidding Soon
3,895
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2024

August 22, 2024

Project location map

Edgewater Dr, Crystal Lake, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.