BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Apex, North Carolina. Contact the soliciting agency for additional information.

Question Deadline 11/11/2022 at 5:00 PM ET The Town will not entertain any further questions after the due date. Written questions shall be emailed to joel.arnold@townofcary.org. The Town of Cary is requesting proposals from qualified providers for the provision of residuals management services for the hauling and beneficial re-use of de-watered residuals from the Cary/Apex Water Treatment Facility. The proposal shall be for the routine management of dewatered residuals generated by the facility. Additionally, the Town of Cary is also requesting proposals for the provision of periodic short-term residuals management services for the hauling and beneficial re-use of dewatered residuals from the South Cary Water Reclamation Facility and the Western Wake Regional Water Reclamation Facility. The proposal shall be for the provision of these services on an as-needed basis. The Town desires to beneficially re-use the residuals from the CAWTF, SCWRF, and WWRWRF. The service provider shall provide for the composting of these residuals. Composting shall be the primary use of this material. Composting shall be conducted at a facility permitted to receive the residuals described herein. The service provider shall submit, as part of their overall plan, a temporary alternate method of bio-solids re-use in the event that composting is unavailable. Land application is not an acceptable contingency plan for the management of these residuals. The Town reserves the right to visit the service providers compost facility at any time to review the composting operation and observe how the Town's residuals are being managed. Typically, the CAWTF generates 10 to fifteen 24-ton loads of dewatered cake weekly. The centrifuges typically operate Monday through Friday and generate a cake dryness of approximately 20-24%. The service provider shall be able to provide an empty trailer for each morning's start-up of the centrifuges and provide empty trailers as needed throughout the day when the facility's operational schedule requires loading or partially loading more than two trailers per day (see item #3 below). Trailers provided shall be approximately 8' x 40' in size and capable of hauling up to 24 wet tons of dewatered residuals. Typically, the SCWRF generates approximately 10 loads of dewatered cake weekly when the biosolids dryer is off-line, at a cake dryness of approximately 18-22%. Typically, the WWRWRF generates approximately 5 to 8 loads of dewatered cake weekly when the biosolids dryer is off-line, with a cake dryness of approximately 16-20%. Approximately 10 to 12 wet tons of sludge will be generated annually from process tanks clean out. There shall be no minimum or maximum loading volume requirements for the trailers or containers used for these services. The Town will make every effort to fully and properly load each vessel. The Town shall not be subject to penalty by the service provider for minimum or maximum loading provisions. Occasionally the operational needs of the CAWTF requires centrifuge operations on extended daily schedules or weekend schedules. Loading three trailers per day has occurred on occasion. Additionally, loading trailers on weekends can occur periodically as well. The service provider shall be able to provide trailers on the frequency needed to maintain consistent operations of the CAWTF centrifuges. Trailers shall be provided for the CAWTF. Trailers provided shall be approximately 8 x 40 in size and capable of hauling up to approximately 24 wet tons of dewatered residuals. Trailers approximately 8 x 40 in size shall also be provided for the SCWRF and WWRWRF. Trailers shall be weighed by certified truck scale. The Town will provide weigh tickets at the SCWRF and WWRWRF upon loading. Trailers and containers shall be relatively clean and free of odors such that they do not create nuisance conditions at Town facilities. The service provider shall be capable of providing a tractor, on a temporary basis should the need arise, for moving of the residuals trailers on the CAWTF site. Additionally, when trailers are provided for the loading of residuals at the SCWRF and WWRWRF, the service provider shall be able to provide a tractor for the moving of the residuals trailers on the site for the duration of services needed. The service provider shall be able to adjust hauling schedules as needed with a 24-hour notice from CAWTF, SCWRF, or WWRWRF staff. The service provider shall provide a single point of contact for coordination of hauling schedules.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
83
Bidding Soon
1,734
All Active Projects
693
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.