BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in San Jose, California. Working plans call for the renovation of a municipal facility.

The IFB was cancelled due to the best interest of the state. Electrical Installation Services Prevailing wage applies DIR registration is required Mandatory walk through Questions Due November 3, 2022 @ 2:00 p.m Bidders shall submit questions via email to KRISTAL GOODELL at Kristal.goodell@chp.ca.gov The Department of California Highway Patrol (CHP), San Jose Area Office, is in need of Electrical Installation Services. Contractor must provide the services described herein: furnish all supplies, materials, tools, equipment, labor, personnel, and supervision; pay all taxes, insurance, bonds, license and permit fees, and all other direct and indirect costs necessary to provide concrete installation service 1. Contractor shall supply a 50-amp 120/240 volt, single phase electrical feed to the Conex box in the secured parking lot. 2. Contractor shall provide a 50-amp breaker for service to the Conex box (if needed). 3. Contractor shall provide the electrical feed to originate from the designated panel in main building electrical room, or new sub-panel as required. 4. Contractor shall run 1" conduit with three (3) #4AWG wire and one (1) #8AWG ground. Actual footage to be determined at bid walk. 5. Contractor shall trench as needed from the electrical room to the Conex box. Actual footage to be determined at the bid walk. 6. Contractor shall install a traffic rated utility box for access if needed at a later date. Exact location to be determined at bid walk. 7. Contractor shall install two (2) extra 1" conduits in the trench, one terminating at the newly installed traffic rated utility box. One will continue through to the interior of the Conex box as a spare if needed at a later date. 8. Contractor shall install a ground rod for the Conex box according to code. 9. Contractor shall back-fill, compact, and replace any concrete or asphalt removed during trenching. Asphalt joints and surfaces in area of excavation shall be sealed after installation. 10.Contractor shall remove all debris and packing material from the job site daily. 11.Contractor shall provide an electrical diagram that fully illustrates the work to be done and the existing conditions for State Fire Marshal (SFM) approval. Refer to the Submittal section, below, for further details. 12.Upon approval by SFM of the electrical diagram, contractor shall attend a preconstruction meeting. 14.Contractor to provide a one (1) year warranty on workmanship as well as the manufacturer's warranty on all components installed.

Final Planning

Municipal

$80,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
136
Bidding Soon
2,697
All Active Projects
1,131
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 9, 2022

May 18, 2023

img_map_placeholder

2020 Junction Ave, San Jose, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.