BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Palatka, Florida. Design plans call for the renovation of a clubhouse / community center.

As of October 17, 2024, an architect has been selected and this projecct is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Hardening of the Price Martin Community Center sufficient to be used as a hurricane shelter including hardening the roof structure, installing new Heating, Ventilation and Air Conditioning (HVAC) equipment to handle increased capacity, replacing existing doors and windows, replacing masonry in building front to withstand high winds, and installation of an emergency generator. Architectural and Structural Engineering services will include design, bidding and construction observation services for the project. A scope of work outlining the tasks to be performed and a timeline to complete the proposed tasks must be included in the proposal. To ensure compliance with Chapter 287.055, do not include pricing within the submittal. Once the City's ranking committee establishes the most qualified individual or firm, the City will negotiate the price and profit with the selected individual or firm. Hand-carried and express mail proposals may be delivered to the above address ONLY between the hours of 8:30 a.m. and 5:00 p.m., local time, Monday through Friday, excluding holidays observed by the City. Respondents are responsible for informing any commercial delivery service, if used, of all delivery requirements and for ensuring that the required address information appears on the outer wrapper or envelope used by such service. Contact: Mandi Tucker 201 North 2 nd Street Palatka, FL 32177 mtucker@palatka-fl.gov Deadline for Questions: 12-23-2022 The City of Palatka reserves the right to reject any and all qualifications, to waive any informalities or irregularities in the proposal process and to award the contract(s) in the best interest of the City. Engineering service contract(s) are contingent on approval by DEO. The method of Contractor Selection has not been Determined at this time.

Design

Clubhouse / Community Centers

$500,000.00

Public - City

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
51
Bidding Soon
1,074
All Active Projects
456
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2025

img_map_placeholder

220 N 11th St, Palatka, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.