BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, renovation and addition to a mixed-use development in Fort Worth, Texas. Completed plans call for the addition of a 25,000-square-foot, two-story above grade municipal facility.

Plans call for the construction of a Chambers Building which will be attached to the 20-story tower that is being renovated for the new city hall. The Chambers Building will be a 25,000 square foot 2-story addition to house city council meetings and other public meeting uses. As of April 28, 2023, permits are pending for the Chambers Building project and a firm construction start timeline has yet to be determined. The City Hall Tower project started construction January 2023. The construction manager is seeking subcontractor trade pricing for the Chambers Building foundation package. Please direct all inquiries to the construction manager. Subcontractors must pre-qualify with the construction manager. Estimate = total project construction cost estimate. QC #1 has been issued as of 11-7-2022. QC #2 has been issued as of 10-28-2022. QC #3 has been issued as of 11-7-2022. See the attached Q&C #1 that is partially answered. Question #1 has been answered. The planter walls will now be excluded. The piers are still included but the associated walls above will be excluded. Question #2, however, and the pad prep is still being addressed. This message only applies to any interested concrete vendors. The Appendix C - Bid Form & Appendix D - Scope of Work have both been updated to include an allowance for the elevated superstructure. This allowance amount is provided on both forms. Your total base bid amount will include this allowance. After contract award and the elevated superstructure design is ready for pricing the Bidder will reconcile this allowance. Note from CM: There were two clerical errors that came to my attention on the instruction to bidder documents. 1. The MWBE participation % was 60%. This is wrong it should be 50%. 2. The retainage was 5%. This should be 10%. I have revised the ITB documents to reflect these changes. The changes are now in red. For ease I've made a single PDF of all bid documents combined. See attached. One is for concrete the other is for the balance of the bids. I apologize for any confusion this may have provided. Thanks, Josh Farmer (817) 504-4324

Award

Municipal

$50,000,000.00

Public - City

Addition, Renovation, Site Work

37

24

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
348
Active Projects
204
Bidding Soon
4,921
All Active Projects
1,957
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 14, 2022

January 30, 2023

January 18, 2024

img_map_placeholder

100 Pier 1 Pl, Fort Worth, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.