Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Oakland, California. Completed plans call for the renovation of a educational facility.
As of November 23rd, 2022, The Fremon t High School project has been awarded to Rock Electric, with an awarded amount of $122,000.00. While the Street Academy Project was awarded to Rock Electric, with an awarded amount of $32,300.00. The total amount of the project was $154,300.00. The tentative start date will be around the first of the year. Scope: Scope of work includes but not limited to installation, replacement, and repair of surveillance cameras at two sites - Fremont HS and Street Academy. Fremont HS includes approximately 32 new, 14 replacements and 37 repairs. Street Academy includes approximately 13 new and 3 repairs (no replacements). All cameras shall be programmed and integrated into Milestone XProtect software. The successful bidder shall have at least 5 years K-12 experience, Milestone certification prior to bid opening, and in-house networking staff. OUSD will provide servers if required, as well as Milestone licenses. Typical camera unit to be installed shall be Hanwha Wisenet QNV-8080R. Bids must be accompanied by a bidder's bond, cashier's check, or certified check for at least ten percent (10%) of the amount of the base bid and made payable to the Owner, as detailed in the Contract Documents. Owner, or its designee, has determined that certain materials, services, products or things designated by specific brand or trade name shall not be subject to Public Contract Code section 3400(a) in order that a field test or experiment may be made to determine the product's suitability for future use; in order to match other materials, services, products or things in use on a particular Owner public improvement either completed or in the course of completion; in order to obtain a necessary item that is only available from one source; and in order to respond to an emergency declared by Owner. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum. The successful bidder will be allowed to substitute securities or establish an escrow in lieu of retainage, pursuant to Public Contract Code Section 22300, and as described in the Agreement Between Owner and Contractor and General Conditions. As of November 23rd, 2022, The Fremon t High School project has been awarded to Rock Electric, with an awarded amount of $122,000.00. While the Street Academy Project was awarded to Rock Electric, with an awarded amount of $32,300.00. The total amount of the project was $154,300.00. The Owner will not consider or accept any bids from contractors who are not licensed to do business in the State of California, in accordance with the California Public Contract Code, providing for the licensing of contractors. In accordance with Section 3300 of said Code, the bidder shall have a C7 - Low Voltage Systems and/or C10 - Electrical Contractors license and Milestone Certification license and shall maintain that license in good standing through Completion of the Contract and all applicable warranty periods. For all projects over TwentyFive Thousand Dollars ($25,000), the bidder shall state the public works contractor registration number on the Designation of Subcontractors form for each subcontractor performing more than one-half of one percent (0.5%) of the bidder's total bid. Engineers Estimates: Fremont High School - $100,000 Street Academy - $25,000 Bid Result: Fremont HS - Rook Electric - $112,000.00 Street Academy - Rook Electric - $29,000.00
Award
Educational
$154,300.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 17, 2022
December 16, 2022
Multiple Locations, Oakland, CA
Related To This Project
Oakland, CA
--
Oakland, CA
Bid Date: Dec 01 2022
Oakland, CA
Bid Date: Dec 01 2022
Oakland, CA
Bid Date: Dec 01 2022
Oakland, CA
Bid Date: Dec 06 2022
Oakland, CA
--
Oakland, CA
--
Oakland, CA
Bid Date: Dec 09 2022
Oakland, CA
--
Oakland, CA
Bid Date: Nov 17 2022
Oakland, CA
Bid Date: Jun 14 2023
Oakland, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.