BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a civil project in Woodway, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Acorn Well Pump Station Improvements consists of but is not limited to all labor, materials, equipment, appurtenances, and incidentals as required to properly install, complete and be accepted in place a new concrete masonry unit (CMU) building to contain an electrical room, chlorine room, and liquid ammonium sulfate (LAS) room. The existing site includes a water well and above-ground 300,000-gallon storage tank originally constructed in 1985, pumping facilities, electrical equipment, chemical equipment, and hydropneumatic pressure tank. A subsequent improvement project was constructed in 1999 that included upgrades to the pumping and site piping along with a new pressure tank and improvements to the chemical injection system. This proposed project will leave the existing well, ground storage tanks, pumping system, and pressure tank in-place and consolidate all electrical and chemical equipment into a single building with all necessary components as shown on the project drawings and as specified herein. Project will be awarded to proposal providing best value to Owner based on a number of factors including cost, experience of contract, and prior work performance. The deadline to ask questions is 2/27/2023 5:00 PM CST OTHER INFORMATION: . Cost Estimate: $665,000 . Construction Schedule (Anticipated): o Start Date: February 2023 o Substantial Completion Date: 250 Calendar Days per Draft NTP o Readiness for Final payment Date: 280 Calendar Days per Draft NTP Work of the Project includes construction of a new concrete masonry unit (CMU) building to contain an electrical room, chlorine room, and liquid ammonium sulfate (LAS) room. The existing well, ground storage tanks, pumping system, and pressure tank are to remain in-place. All existing electrical and chemical equipment with all necessary components will be consolidated into the new building as shown on the project drawings and as specified herein. Substantial Completion is 250 calendar days, and the number of days to achieve readiness for final payment is 280 calendar days All questions must be submitted electronically through CivCast's Question and Answer feature. For more information, contact Amy Jo Moreno at (254) 714-1402 or amoreno@walkerpartners.com. Work of the Project includes construction of a new concrete masonry unit (CMU) building to contain an electrical room, chlorine room, and liquid ammonium sulfate (LAS) room. The existing well, ground storage tanks, pumping system, and pressure tank are to remain in-place. All existing electrical and chemical equipment with all necessary components will be consolidated into the new building as shown on the project drawings and as specified herein.

Bid Results

Water / Sewer

$1,057,148.00

Public - City

Subscribe For Documents

111 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
30
Bidding Soon
1,101
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.