Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a civil project in Woodway, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Acorn Well Pump Station Improvements consists of but is not limited to all labor, materials, equipment, appurtenances, and incidentals as required to properly install, complete and be accepted in place a new concrete masonry unit (CMU) building to contain an electrical room, chlorine room, and liquid ammonium sulfate (LAS) room. The existing site includes a water well and above-ground 300,000-gallon storage tank originally constructed in 1985, pumping facilities, electrical equipment, chemical equipment, and hydropneumatic pressure tank. A subsequent improvement project was constructed in 1999 that included upgrades to the pumping and site piping along with a new pressure tank and improvements to the chemical injection system. This proposed project will leave the existing well, ground storage tanks, pumping system, and pressure tank in-place and consolidate all electrical and chemical equipment into a single building with all necessary components as shown on the project drawings and as specified herein. Project will be awarded to proposal providing best value to Owner based on a number of factors including cost, experience of contract, and prior work performance. The deadline to ask questions is 2/27/2023 5:00 PM CST OTHER INFORMATION: . Cost Estimate: $665,000 . Construction Schedule (Anticipated): o Start Date: February 2023 o Substantial Completion Date: 250 Calendar Days per Draft NTP o Readiness for Final payment Date: 280 Calendar Days per Draft NTP Work of the Project includes construction of a new concrete masonry unit (CMU) building to contain an electrical room, chlorine room, and liquid ammonium sulfate (LAS) room. The existing well, ground storage tanks, pumping system, and pressure tank are to remain in-place. All existing electrical and chemical equipment with all necessary components will be consolidated into the new building as shown on the project drawings and as specified herein. Substantial Completion is 250 calendar days, and the number of days to achieve readiness for final payment is 280 calendar days All questions must be submitted electronically through CivCast's Question and Answer feature. For more information, contact Amy Jo Moreno at (254) 714-1402 or amoreno@walkerpartners.com. Work of the Project includes construction of a new concrete masonry unit (CMU) building to contain an electrical room, chlorine room, and liquid ammonium sulfate (LAS) room. The existing well, ground storage tanks, pumping system, and pressure tank are to remain in-place. All existing electrical and chemical equipment with all necessary components will be consolidated into the new building as shown on the project drawings and as specified herein.
Bid Results
Water / Sewer
$1,057,148.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2023
March 31, 2023
To Be Determined, Woodway, TX
Related To This Project
Woodway, TX
--
Woodway, TX
Bid Date: Dec 01 2022
Woodway, TX
--
Woodway, TX
Bid Date: May 12 2022
Woodway, TX
--
Woodway, TX
Bid Date: Oct 04 2022
Woodway, TX
Bid Date: Feb 17 2022
Woodway, TX
--
Woodway, TX
--
Woodway, TX
Bid Date: Jun 17 2022
McKinney, TX
Bid Date: Dec 02 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.