BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a municipal facility in Georgetown, Colorado. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

The Clear Creek County is seeking a qualified firm to perform the following tasks associated with the Concrete Building Demolition Project: Demolition and removal of existing cinder block building (approximately 2,800 sf) without harming the historic radium mine located within; Remove cinder block building walls, roof, slab, backfill basement and adjacent cinder block lined pit, and grade resulting disturbed area; All large rocks, brush debris, structures and all other unsuitable material shall be cleared to a depth of at least twelve (1 2) inches below the existing foundations and graded to create a relatively level surface even with adjacent grades; Revegetation of disturbed area in accordance with the Clear Creek County Best Management Practices Manual; and, Comply with the permit requirements for erosion control and floodplain protection. (Permits will be obtained by County staff.) Exact erosion control and Creek protection measures will be determined in the Minor Grading and Excavation and Floodplain permits. The list of tasks is not exhaustive. (Additional tasks are identified in Part Three. Scope of Services.) Clear Creek County is looking for a firm with experience in demolishing buildings in constrained settings. Asbestos abatement has been completed. Timing is dependent on availability of selected contractor, however, demolition of the building shall be completed by the end of 2022. This project is the demolition of a 1 920's cinder block building adjacent to Clear Creek in Clear Creek Canyon (off of US6.) Asbestos abatement has been completed. Within the cement block building is a historic radium mine. A schematic of the building layout and mine location is attached in Exhibit A. Photos of the mine are also attached in Exhibit B. Demolition should be done in a manner that does not harm the mine. Clear Creek County reserves the absolute right to accept or reject any and all proposals submitted, and the County's final acceptance of any proposal will be based upon the negotiation of terms that are acceptable to Clear Creek County. Clear Creek County intends to make a bid selection by November 18, 2022. The County reserves the right to extend the selection period, not make a selection or to go back out for bid, and to update the RFB. The selected bid contractor will be notified of the decision.

Post-Bid

Municipal

$50,000.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
108
Bidding Soon
1,706
All Active Projects
706
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 10, 2022

December 12, 2022

December 31, 2022

img_map_placeholder

US-6, Georgetown, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.