BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a medical facility in Smithville, Texas. Completed plans call for the construction of a medical facility.

MD Anderson seeks to procure design-build services for the design and construction of a free-standing comprehensive cancer care facility of about 122,000 building gross square feet to include space for radiation oncology, infusion therapy, multidisciplinary clinics, pharmacy and clinical laboratory services. While the exact site has yet to be determined, the facility is expected to be located on a parcel of land not less than 5 acres but not more than 9 acres located in the northeast quadrant of the greater Houston area. MD Anderson has established a total project cost budget in the amount of $140,000,000 for the design, construction and equipping of the facility, which amount includes a design-build budget limitation (DBBL) of ninety-three million, eight-hundred thousand dollars ($93,8000,000). The design-build contractor's ability to work collaboratively with MD Anderson during the preconstruction phase to accurately estimate the construction cost for the project and to develop a sound delivery plan (including construction phasing as needed) to stay within the DBBL will be critical to the overall success of this project. The balance of the TPC budget includes major medical equipment, minor medical equipment, furniture, and costs for other services needed to complete the project. MD Anderson anticipates that the facility may be constructed in two stages. Stage one would focus on the construction of the facility core and shell and the finish out of space for radiation oncology and related services. Stage two would focus on finishing out the interior for the remaining services. However, during the Preconstruction Phase, the DBC will be expected to work with MD Anderson to confirm to what extent the project will be divided into separate stages for implementation.

Post-Bid

Medical

$140,000,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
41
Bidding Soon
2,048
All Active Projects
786
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2022

October 2, 2023

img_map_placeholder

To Be Determined, Smithville, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.