Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 29, 2022 at 8:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Bayboro, North Carolina. Contact the soliciting agency for additional information.
This project is funded through an awarded AIA Grant. The selected firm will be required to help facilitate project funding through the preparation a reporting. These reports will need to be prepared in accordance with the applicable guidelines. The full range of professional services will be further defined during project development, but may include the following: funding application assistance, preliminary reports, design, bidding/negotiation, construction administration, resident project representation, property surveying, easement, surveying, geotechnical, special inspections, etc. The method of contractor selection has not been determined at this time
Conceptual
Water / Sewer
Public - County
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
