Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 1, 2022 at 8:00 PM

Updated May 4, 2024

This is a service / maintenance or supply contract in Edmonton, Alberta. Contact the soliciting agency for additional information.

Following the 2013 floods, Alberta Environment and Protected Areas (AEPA, the "Department") identified the need to investigate the feasibility of potential water storage options on the Bow River upstream of the City of Calgary. Phase 1, the Bow River Reservoir Options (BRRO) Conceptual Assessment, identified three reservoir options that could potentially provide the necessary flood and drought mitigation along the Bow River upstream of Calgary: a new Morley reservoir, a new Glenbow reservoir, and expanding the Ghost Reservoir. The Conceptual Assessment concluded in 2020. Building on the work completed in the Conceptual Assessment, the Phase 2 BRRO Feasibility Study is assessing the technical feasibility of these three options with the purpose of providing information to help inform a government decision on an option to proceed, if any, to the next phase of final design and regulatory approval (Phase 3). In December 2020, the Department contracted the services of a prime consultant ("Prime Consultant") to complete the Feasibility Study work. Building on the work completed in the Conceptual Assessment, the Prime Consultant is drafting a series of specialized project reports that will become a part of the larger, Phase 2 Feasibility Study final report; this work is well underway. The Government of Alberta would like to engage a team of technical reviewers ("Review Team") consisting of independent experts to participate in the development of major water management projects where public safety is a significant consideration. The purpose of these Review Team is to, independent of the option designers and contractors, review and advise the government on technical matters related to the design and safety of high hazard structures such as major dams and their appurtenant structures. The Method of Contractor Selection has not been determined at this time.

Conceptual

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
30
Bidding Soon
562
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2023

Project location map

To Be Determined, Edmonton, AB

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed