Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 30, 2023 at 7:00 PM

Updated January 25, 2024

Site work and paving for a mixed-use development in Bothell, Washington. Completed plans call for site work for a bridge / tunnel; road / highway; water / sewer project; sidewalk / parking lot; for paving for a road / highway; and sidewalk / parking lot.

Per addendum #3, bid date has been postponed from 12/20/22 to 1/5/2023. The NORTH CREEK TRAIL SECTION 4 - PHASE 2 AND PHASE 3 proposes to construct a shared use non-motorized path between the Centennial Park driveway and the North Creek Trail Section 3 terminus along the south side of SR524. The general aspects of this work will involve construction of approximately 1,875 linear feet of 10-foot-wide paved trail with planter strip, mechanically stabilized earth wall, soldier pile wall, a moment slab over the existing Filbert Creek box culvert, pedestrian bridge crossingof North Creek, construction of approximately 1,758 linear feet of 12-inch-diameter water main, street light relocation, erosion control, site preparation, fencing, and utility adjustments Federal Aid Project STPUL-0110(017) (Phase 2) Federal Aid Project #TAP-0110(018) (Phase 3) The total estimated cost for this project is in the range of $4,360,000 to $4,820,000. The City of Bothell reserves the right to reject any or all bids and to waive minor irregularities or informalities and to further make award of the project to the lowest responsive, responsible bidder as it best serves the interest of the City.

Award

Roads / Highways

$4,874,910.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
137
Bidding Soon
2,097
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2023

April 3, 2023

Project location map

Multiple Locations, Bothell, WA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed