BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 23, 2022 at 7:00 PM

Updated January 25, 2024

Site work and renovation of a civil project in Harrah, Oklahoma. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Sanitary sewer system improvements harrah road lift station rehabilitation city of harrah oklahoma The City of Harrah will receive sealed bids for Sanitary Sewer System Improvements. Quantity Unit Description 1.00 L.S. 10' Dia. X 19.25' Depth Triplex Lift Station and Valve Vault (Three 75 HP Pumps w. VFDs) 2.00 L.S. Generator & Electrical 182.00 L.F. 2" PVC SDR 26 Sanitary Sewer Main 68.00 L.F. 8" PVC C900 DR18 Force Main 1.00 Ea. Interconnect to Existing 8" Force Main 3.00 Ea. 4' Dia. Manholes 110.00 L.F. Bore & Install 8" Force Main 320.00 S.Y. 6" Thk. Type 1 Aggregate Base 1.00 Ea. 1-Ton Jib Crane & Concrete Footing 1.00 L.S. 5' Retaining Wall (68.67' Length) 1.00 L.S. Demo Existing Lift Station A bid bond in the amount of 5% of the total amount bid shall be attached to all bids as a guarantee that the successful bidder will, within ten (10) days of the date of notice of award, enter into contract and file the required bonds. No bidder may withdraw his bid within 45 days after the actual date of the opening thereof. The Owner reserves the right to reject any or all bids, waive any irregularities or techni- calities without assigning any reason therefore, and to make the awards in the best interest of the Owner. Bids are solicited and a contract award will be made pursuant to the Public Competitive Bidding Act of 1974 as amended (Title 61, O.S. 1981, Sections 101-136 et seq.) Contractor will be issued a username and password to retrieve the Specifications upon payment. Contractor must obtain plans and specifications from the office of the Engineer and be registered on the Engineer's bid list to be recognized as an eligible bidder for this project. Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the office designated in the solicitation by the time specified in the solicitation. Any proposal, modification, or revision received at the office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered. City of Harrah Cost estimate: $780, 000 to $825,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$825,000.00

Public - City

Renovation, Site Work

22

35

8

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
90
Bidding Soon
1,132
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2022

December 16, 2022

Project location map

S Harrah Rd, Harrah, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.