Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 10, 2024 at 8:00 PM
Updated April 11, 2024
Site work and remodeling of an educational facility in Harrah, Oklahoma. Completed plans call for the remodel of a 17,850-square-foot educational facility; and for site work for a educational facility.
Remodel of existing 17,580 sq ft metal building with interior finish out associated site work. Direct question in writing to Scott Berger via e-mail at: estimating@timberlakeconstruction.com The Contractor will be responsible for creating a safe and healthy workplace for all of its personnel and the School districts personnel and students. It is the purpose of this Program to: 1. Abide by all local, state, and federal regulations and School District procedures. 2. Apply good sense and safety practices to the project. 3. Exercise good judgment in the interpretation of this guidance Program. 4. Protect the public from any and all health hazards, which result from the construction operations. B. The Contractor shall prepare and submit a Student and Site Safety Program (SSSP) and the SSSP shall incorporate: 1. The unique safety requirements at each site. 2. Procedures in case of an accident, hazard, or emergency. 3. A plan for ensuring the safety and well being of the students, faculty and School District personnel. 4. A plan for personnels safety on the job site. C. The Contractor will be made responsible for initiating and administering the SSSP. D. The SSSP for the project will be subdivided into the following sections: 1. General Statement of Safety Policy. 2. School Administration/Student Awareness. 3. Responsibilities/Implementation/Accident Prevention. 4. Site Specific Requirements for Contractor Operations. 5. Fire/Hazardous Material/Building Collapse/Explosion Procedures. 6. After hours Site Access and Security Plan. 7. Reporting/Recording of Safety Related Issues. E. The Contractor shall develop job site personnel policies that include: 1. Appropriate dress. 2. Appropriate language. 3. Prohibiting interaction with students and school personnel. 4. Background checks on construction personnel. 5. Daily reports/notices regarding how many construction employees are on site, when, where, and what time they left the site. 6. No drugs, alcohol or smoking on school grounds. Policy for use of radios/other entertainment devices. 7. Notification of power and utility outages, special conditions outside of construction areas. 8. Daily clean up in all co-utilized areas of school building and grounds. F. All contractor employees are required to comply with the provisions of the SSSP when working at the job site. Employees unwilling or unable to comply with any provision of the SSSP, which applies to their work, shall not be allowed on the job site. 1. For Contractors use in the SSSP, several telephone numbers are listed below. The Contractor shall confirm these phone numbers at the start of the project and update the phone numbers as required.
Post-Bid
Educational
$2,232,660.00
Public - City
Remodeling, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2024
April 4, 2024
20669 Walker St, Harrah, OK
Related To This Project
Harrah, OK
Bid Date: Aug 29 2024
Harrah, OK
Bid Date: Oct 15 2024
Harrah, OK
Bid Date: Oct 25 2024
Harrah, OK
Bid Date: Nov 19 2024
Harrah, OK
Bid Date: Dec 17 2024
Harrah, OK
Bid Date: Feb 25 2025
Harrah, OK
Bid Date: Apr 17 2025
Harrah, OK
Bid Date: Nov 03 2023
Harrah, OK
Bid Date: Mar 29 2022
Harrah, OK
Bid Date: Apr 27 2023
Harrah, OK
--
Harrah, OK
Bid Date: Jul 14 2022
Harrah, OK
Bid Date: Dec 08 2022
Harrah, OK
Bid Date: Nov 16 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
