BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Harrah, Oklahoma. Completed plans call for site work for a water / sewer project.

As of October 31, 2024 this project was already been awarded in the otal awarded amount of $2,785,781.20 Section 1: Jordan Contractors $$945,142.30 Section 2: Jordan Contractors $1,208,104.70 Section 3: Grade Work Construction, LLC $$632,534.20 Quantity Unit Description Section 1 (Line L from Station 10+00.00 to Station 30+79.03) 2,279.17 L.F. 24" PVC PS46 Sewer Main 200.14 L.F. Excavation and Backfill (0'-20') 2,079.03 L.F. Excavation and Backfill (0'-15') 1.00 Ea. 5' Dia. Manhole 6.00 Ea. 4' Dia. Manhole 30.43 V.F. Extra Depth Manhole Section 2 (Line L from Station 30+79.03 to Station 62+22.23) 1,201.57 L.F. 24" PVC PS46 Sewer Main 1,941.66 L.F. 18" PVC PS46 Sewer Main 448.95 L.F. Excavation and Backfill (0'-25') 1,462.36 L.F. Excavation and Backfill (0'-20') 1,231.92 L.F. Excavation and Backfill (0'-15') 8.00 Ea. 4' Dia. Manhole 75.30 V.F. Extra Depth Manhole Section 3 (Line L from Station 62+22.23 to Station 79+01.82) 1,589.14 L.F. 18" PVC PS46 Sewer Main 110.00 L.F. Directional Bore & Install 22" PE SDR 11 Sewer Main 1,479.14 L.F. Excavation and Backfill (0'-15') 7.00 Ea. 4' Dia. Manhole 27.47 V.F. Extra Depth Manhole When Architect/Engineer requires substantiating information, submit data justifying dollar amounts in question. B. Provide one copy of data with cover letter for each copy of submittal. Show application number and date, and line item by number and description.

Award

Water / Sewer

$2,785,781.00

Public - City

Site Work

26

25

11

4

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
60
Bidding Soon
694
All Active Projects
302
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

November 14, 2024

img_map_placeholder

Reno Ave, Harrah, OK


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.