Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Poteau, Oklahoma. Completed plans call for site work for a water / sewer project.
The Owner May Consider Informal Any Bid Not Prepared and Submitted in Accordance With the Provisions Hereof and May Waive Any Informalities or Reject Any and All Bids. Any Bid May Be Withdrawn Prior to the Above Scheduled Time for the Opening of Bids or Authorized Postponement Thereof. No Bidder May Withdraw a Bid Within 60 Days After the Actual Date of the Opening Thereof. Bids Will Not Be Accepted by the Owner More Than 72 Hours Prior to the Scheduled Bid Opening. 2. Preparation of Bid the Following Forms Shall Be Included With the Bid: Bid Proposal, Business Relationship Affidavit, Bid Bond, Non Collusion Affidavit, Payroll Affidavit and Certificate as to Corporate Principal. Any Bid Submitted Without All Forms Completed Will Be Rejected. Each Bid Must Be Submitted in a Sealed Envelope, Bearing on the Outside, the Name of the Bidder, His Address, and the Name of the Project for Which the Bid is Submitted. If Forwarded by Mail, the Sealed Envelope Containing the Bid Must Be Enclosed in Another Envelope Addressed as Specified in the Bid Form. A Conditional or Qualified Bid Will Not Be Accepted. 3. Subcontracts the Bidder is Specifically Advised That Any Person, Firm, or Other Party to Whom It is Proposed to Award a Subcontract Under This Contract Shall Be Subject to Acceptance by the Owner. Approval of the Proposed Subcontract Award Will Not Be Given by the Owner Unless and Until the Proposed Subcontractor Has Submitted Certifications and/or Other Evidence Required by the Owner Attesting to the Subcontractors Qualifications. 4. Telegraphic Modification Any Bidder May Modify His Bid by Telegraphic Communication at Any Time Prior to the Scheduled Closing Time for Receipt of Bids, Provided Such Telegraphic Communication is Received by the Owner Prior to the Closing Time, and Provided Further the Owner is Satisfied That a Written Confirmation of the Telegraphic Modification Over the Signature of the Bidder Was Mailed Prior to the Closing Time. The Telegraphic Communication Should Not Reveal the Bid Price but Should Provide the Addition or Subtraction or Other Modification So That the Final Prices or Terms Will Not Be Known by the Owner Until the Sealed Bid is Opened. If Written Confirmation is Not Received Within Two Days From the Closing Time, No Consideration Will Be Given to the Telegraphic Modification. 5. Method Bidding the Owner Invites the Following Bid(S) for the Meter Relocations. 6. Qualification of Bidder the Owner May Make Such Investigations as He Deems Necessary to Determine the Ability of the Bidder to Perform the Work, and the Bidder Shall Furnish to the Owner All Such Information and Data for This Purpose as the Owner May Request. The Owner Reserves the Right to Reject Any Bid if the Evidence Submitted by, or Investigation of Such Bidder Fails to Satisfy the Owner That Such Bidder is Properly Qualified to Carry Out the Obligations of the Contract and to Complete the Work Contemplated Therein. Conditional Bids Will Not Be Accepted. 7. Bid Security Each Bid Must Be Accompanied by Cash, Certified Check of the Bidder, or a Bond Prepared on the Form of Bid Bond Attached Hereto, Duly Executed by the Bidder as Principal and Having as Surety Thereon a Surety Company Approved by the Owner, in the Amount Not Less Than 5% of the Bid. Such Cash, Check or Bid Bond Will Be Returned, if Requested, to All Except the Three Lowest Bidders Within Three Days After the Opening of Bids, and the Remaining Cash, Check or Bid Bond Will Be Returned, if Requested, Promptly After the Owner and the Accepted Bidder Have Executed the Contract, or if No Award Has Been Made Within 30 Days After the Date of the Opening of Bids, Upon Demand of the Bidder at Any Time Thereafter, as Long as He Has Not Been Notified of the Acceptance of His Bid. 8. Liquidated Damages for Failure to Enter Into Contract the Successful Bidder, Upon His Failure or Refusal to Execute and Deliver the Contract and Bonds Required Within 10 Days After He Has Received Notice of the Acceptance of His Bid, Shall Forfeit to the Owner, as Liquidated Damages for Such Failure or Refusal, the Security Deposit With His Bid. 9. Time of Completion and Liquidation Damages Bidder Must Agree to Commence Work on or Before a Date to Be Specified in a Written "Notice to Proceed" of the Owner and to Fully Complete the Work Within 90 Consecutive Calendar Days Thereafter. Bidder Must Agree Also to Pay as Liquidated Damages, the Sum of $600.00 for Each Consecutive Calendar Day Thereafter as Hereinafter Provided in the General Conditions. 10. Condition of Work Each Bidder Must Inform Himself Fully of the Conditions Relating to the Construction of the Project and the Employment of Labor Thereon. Failure to Do So Will Not Relieve a Successful Bidder of This Obligation to Furnish All Material and Labor Necessary to Carry Out the Provisions of His Contract. Insofar as Possible the Contractor, in Carrying Out His Work, Must Employ Such Methods or Means as Will Not Cause Any Interruption of or Interference With the Work of Any Other Contractor. Any Item Required to Complete the Project to Have a Complete Functional Facility or Required by the Specifications for Which Bid Items Are Not Set Up Shall Be Included in Other Bid Items. Meter Relocations Along Towry & Nail Creek& Along Picture Rock & Kerr Mansion All Applicable Laws, Ordinances, and the Rules and Regulations of All Authorities Having Jurisdiction Over Construction of the Project Shall Apply to the Contract Throughout. 11. Addenda and Interpretations No Interpretations of the Meaning of the Plans, Specifications or Other Pre-bid Documents Will Be Made to Any Bidder Orally. Every Request for Such Interpretation Should Be in Writing and Addressed to: Wdb Engineering P.l.l.c. 6330 S.e. 74th Street, Oklahoma City, Ok 73135 and to Be Given Consideration Must Be Received at Least Five Days Prior to the Date Fixed for the Opening of Bids. Any and All Such Interpretations and Any Supplemental Instruction Will Be in the Form of Written Addenda to the Specifications Which, if Issued, Will Be Mailed by Certified Mail With Return Receipt Requested to All Prospective Bidders (at the Respective Address Furnished for Such Purposes), Not Later Than Three Days Prior to the Date Fixed for the Opening of Bids. Failure of Any Bidder to Receive Any Such Addendum or Interpretation Shall Not Relieve Such Bidder From Any Obligation Under His Bid as Submitted. All Addenda So Issued Shall Become Part of the Contract Documents. 12. Security for Faithful Performance Simultaneously With His Delivery of the Executed Contract, the Contractor Shall Furnish a Performance Bond, Statutory Bond and Maintenance Bond or Bonds, Each in the Amount of 100% of the Contract Price, as Security for Faithful Performance of This Contract and for the Payment of All Persons Performing Labor on the Project Under This Contract and Furnishing Materials in Connection With This Contract, as Specified in the General Conditions Included Herein. The Surety on Such Bond or Bonds Shall Be a Duly Authorized Surety Company Satisfactory to the Owner. 13. Power of Attorney Attorneys-in-fact Who Sign Bid Bonds or Contract Bonds Must File With Each Bond a Certified and Effectively Dated Copy of Their Power of Attorney. 14. Notice of Special Conditions Attention is Particularly Called to Those Parts of the Contract Documents and Specifications Which Deal With the Following: a. Inspection and Testing of Materials B. Insurance Requirements C. Stated Allowances D. Time of Completion 15. Laws and Regulations the Bidder's Attention is Directed to the Fact That All Applicable Federal or State Laws, Municipal Ordinances, and the Rules and Regulations of All Authorities Having Jurisdiction Over Construction of the Project Shall Apply to the Contract Throughout, and They Will Be Deemed to Be Included in the Contract the Same as Though Herein Written Out in Full. 16. Method of Award - Lowest Qualified Bidder if at the Time This Contract is to Be Awarded, the Lowest Base Bid Submitted by a Responsible Bidder Does Not Exceed the Amount of Funds, Then Estimated by the Owner as Available to Finance the Contract, the Contract Will Be Awarded on the Base Bid Only. If Such Bid Exceeds Such Amount, the Owner May Reject All Bids or May Award the Contract on the Base Bid Combined With Such Deductible Alternates Applied in Numerical Order in Which They Are Listed in the Form of Bid, as Produces a Net Amount Which is Within the Available Funds. 17. Obligation of Bidder at the Time of the Opening of Bids, Each Bidder Will Be Presumed to Have Inspected the Site and to Have Read and to Be Thoroughly Familiar With the Plans and Contract Documents (Including All Addenda). The Failure or Omission of Any Bidder to Examine Any Form, Instrument or Document Shall in No Way Relieve Any Bidder From Any Obligation in Respect of His Bid. 18. Inspection Trips if Requested by Any of the Bidders an Inspection Trip May Be Coordinated With the Leflore County Rwd #1, 205 S. Mckenna Street, Poteau, Ok 74953. The Engineer is Wdb Engineering P.l.l.c.. And Whose Address is 6330 S.e. 74th Street, Oklahoma City, Ok 73135. The Contract Consists of Furnishing and Installing All Material and Equipment for a Meter Relocations as Shown in the Plans and Specifications. The Information for Bidders, Form of Bid, Form of Contract, Specifications, and Form of Bid Bond, Performance and Payment Bond, and Other Contract Documents May Be Examined at the Following: Wdb Engineering Pllc 6330 S.e. 74th Street Oklahoma City, Ok 73135 Owner Reserves the Right to Waive Any Informalities or to Reject Any or All Bids.
Post-Bid
Water / Sewer
$140,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 7, 2022
January 6, 2023
Multiple Locations, Poteau, OK
Related To This Project
Poteau, OK
Bid Date: Apr 11 2022
Poteau, OK
Bid Date: Apr 15 2022
Poteau, OK
Bid Date: Apr 14 2022
Poteau, OK
Bid Date: May 05 2022
Poteau, OK
Bid Date: Apr 22 2022
Poteau, OK
Bid Date: Jun 06 2022
Poteau, OK
Bid Date: Jan 05 2023
Poteau, OK
Bid Date: Jun 17 2022
Poteau, OK
--
Poteau, OK
Bid Date: Oct 13 2022
Muskogee, OK
Bid Date: Nov 29 2022
Enid, OK
Bid Date: Sep 15 2022
Spiro, OK
Bid Date: Sep 29 2022
Tulsa, OK
Bid Date: Sep 14 2022
Edmond, OK
Bid Date: Aug 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.