Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a water / sewer project in Flower Mound, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
As of November 30th, 2023 this project is pending an award decision. The Project consists of furnishing all labor, equipment and materials (except as otherwise specified), and performing all work necessary for the construction of the lift station improvements to include the replacement of the two submersible pumps, replacement of valve vault, piping and valve improvements, odor control unit replacement, wet well recoating, wet well lid replacement, site paving, site piping modifications, site grading, fence replacement and electrical and instrumentation improvements. Question Deadline 10/17/2023 , 12:00pm (CT) After that day and time, no bidder questions will be accepted or answered by the Engineer or Town. All questions must be submitted in writing to Sabrina Zadow via email address purchasing@flower-mound.com. Engineers Estimate = $1,200,000.00 Time for Substantial Completion 270 Calendar Days Time for Final Completion 300 Calendar Days Not less than the federally determined prevailing wage rate, as issued by the U.S. Department of Labor, must be paid on this project or the prevailing wages for Denton County, as published by The Associated General Contractors of Texas, whichever rate is higher. Unless otherwise provided in the Supplementary Conditions, the Contractor shall obtain and pay for all construction permits and licenses The Bidder agrees that the Work will reach Final Completion within the above number of calendar days after Effective Start Date as shown in the Notice to Proceed and accepts the Two Hundred Fifty Dollars ($250.00) per day liquidated damages provision of the Supplementary Conditions in the event of failure to reach Final Completion of the work within the specified time period as fair and just compensation to Town for the damages it suffers as a result of any such delays. The Town reserves the right to accept the bid which, in its judgment is the lowest responsible bid; to reject any or all bids; and to waive irregularities or informalities in any bid received, deemed to be in the best interest of the Town.
Award
Water / Sewer
$1,581,300.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 24, 2023
January 10, 2024
Glen Chester Dr, Flower Mound, TX
Related To This Project
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
Bid Date: Aug 15 2023
Flower Mound, TX
--
Flower Mound, TX
--
Flower Mound, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.