EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 24, 2023 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Mount Holly, New Jersey. Completed plans call for site work for a water / sewer project.

The County is not responsible for any bid not submitted on time. The County is not responsible for any internet or electronic issues that may include, but not be limited to, connection issues, technical difficulties, errors, power outages, etc. All solicitations are subject to change. It is the responsibility of the vendor to check the website for any future addenda, revisions, etc. prior to the opening date. Failure to do so could result in rejection of your bid submission. AFFIRMATIVE ACTION; Bidders are required to comply with the requirements of N.J.S.A.10:5-31 et seq. and N.J.A.C.17:27. Any Bid Not Submitted Electronically by the Deadline Will Be Automatically Rejected by the Countys Division of Purchasing. Questions Deadline: 1/23/2023 05:00 PM (ET) Please visit the Pipe, Ductile Iron (4-BUCCP-22025) solicitation at https://burlcobids.ionwave.net to submit questions by the deadline. This work shall consist of installing a Cured-in-Place Pipe Liner (CIPPL) that is inverted into and through existing various pipe sizes (12" to 36"). This work shall include but not limited to reinforced concrete, corrugated metal, and vitrified clay pipes to rehabilitate any structurally and/or functionally deterioratedstorm sewer pipes using the trenchless method. The CIPPL shall be inserted through existing structures including but not limited to Type B-inlets, manholes, and bridge abutment walls utilizing a vertical inversion standpipe and hydrostatic pressure. The CIPPL resin shall then be cured in by an approved EPA/DEP material into a hard, impermeable pipe. When cured, the CIPPL shall extend over the entire length of the inversion and shall form a continuous watertight-pipe-within-a-pipe. Any excess water or material must be removed from the stormwater system by the Successful Bidder. No contaminants shall discharge out the stormwater system. This work shall include design, construction, installation, operation, maintenance, and removal of Temporary Drainage Pipe By-pass System. The by-pass system shall be of adequate capacity to handle the flow. System shall be designed and maintained in accordance with NJDEP regulations for waterways. This work shall include repairing line obstruction such as dropped joints and the, removal and the disposal of dirt, refuse, debris, littler, and other foreign materials encountered inside and within the area of the full length of existing pipes prior to CIPPL inversion. The removal method shall not damage the existing pipe. Damage to the existing drainage system as result of careless or improper cleaning operations shall be repaired by the Successful Bidder without additional compensation. The material removed shall be disposed of according to applicable local, state, and federal laws and regulations. No additional compensation will be given for disposal of material removed from pipes.

Bid Results

Water / Sewer

$10,836,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Execution and Closeout Requirements, Cleaning and Waste Management
Division 12 - Furnishings

Division 12 - Furnishings

Art
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
458
Active Projects
276
Bidding Soon
4,408
All Active Projects
1,923
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2023

April 1, 2023

img_map_placeholder

Multiple Locations, Mount Holly, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Pipe Lining 2022

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.