BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 7, 2022 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in East Hartford, Connecticut. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; water / sewer project; and sidewalk / parking lot.

The King Court Storm Sewer project consists of: (1) soil sediment and erosion control, (2) removal of the existing 10 & 12 CIP Storm Drainage including manholes and catch basins owned by the Town of East Hartford, (3) installation of new 24 and 36 RCP including manholes, catch basins, and tie-in to a DOT catch basin, (4) relocation of 28 of 8 PVC Sanitary Sewer and two manholes owned by MDC, (5) protection of adjacent utilities, (6) demolition of paving, sidewalk, and turf, (7) installation of temporary paving patches, (8) installation of permanent paving patches, (9) milling and new overlay paving of the road, paving of driveway aprons, installation of curbs, and line painting, (10) replacement of a small section of sidewalk and (11) restoration of turf. The depth of excavation is approximately 11 to 15. Question Deadline 11/17/2022 at 3:00 PM ET Clarification or Questions can be emailed to Erica Levis at elevis@crdact.net. Bidders are encouraged to submit questions or requests for clarification as soon as possible.

Post-Bid

Water / Sewer

$800,000.00

Public - State/Provincial

Paving, Site Work

20

15

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
902
Active Projects
394
Bidding Soon
7,224
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2022

July 3, 2023

Project location map

King Ct, East Hartford, CT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.