EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 29, 2022 at 7:00 PM

Updated October 1, 2024

Site work and renovation of a civil project in Middle Smithfield Township, Pennsylvania. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of December 19, 2022 , this project has not yet been awarded. The project is expected to be awarded on December 23, 2022. FILE NO. 2022-01056.01 The BASE BID for This project involves replacement of the piping in the wet well and valve vault and additional modifications and restoration work at Pump Station #3 located at the intersection of Milford Road and McCole Road in Middle Smithfield Township, Monroe County, PA. Each bid shall be submitted in accordance with the Instructions to Bidders and must be accompanied by a Bid Bond or Certified Check for not less than ten percent (10%) of the Bid amount payable to Middle Smithfield Township along with an Agreement of Surety certifying that the required Performance and Payment Bonds will be provided to the Bidder. Each bid must be enclosed in a securely sealed opaque envelope and endorsed: Contract 2022-01, Pump Station #3 Modifications with the name and address of the Bidder clearly marked on the envelope. The successful Bidder shall be required to furnish proof of insurance and bonds for Performance(100%), Payment(100%), and Maintenance(15% for 18 months) in such form as meets the approval of the Township and having as security thereon such Surety company or companies as are listed on the U.S. Treasures Circular 570 and authorized to perform services in the Commonwealth of Pennsylvania, prior to award of a contract, in accordance with the Public Works Contractor s Bond Law of 1967, Act of December 20, 1967, P.L. 869,8 P.S. 191 et Seq.. This project is subject to applicable provisions of Act 422, Pennsylvania Prevailing Wage Act as amended and the prevailing minimum wage rates issued by the Pennsylvania Department of Labor and Industry. This project is also subject to applicable provisions of the Pennsylvania Human Relations Act , Act of 1955, P.L., No. 222, as amended June 25, 1997 by Act 34 of 1997, 43 P.S. &&951-963. The Pennsylvania Public Works Employment Verification Act (Act 127 of 2012) applies to the project. As a precondition of letting any contract, the successful bidder must file a form with the Township verifying that all employees hired after January 1, 2013 are legally eligible to work in this country. No Bidder may withdraw his bid within sixty (60) days after the date set for the opening of the bids. The Township reserves the right to reject any and all bids for any cause whatsoever, to eliminate any item or items from the contract, and to waive any informalities, irregularities, or technicalities, including typographical errors in the bids. The Township expressly reserves the right to reject or accept any or all bids and may re-advertise if the best interests of the Township are to be hereby promoted. The Township may waive technical defects if, in its judgment, the best interests of the Township shall so require. No bid may be considered from any person, firm or corporation who has defaulted in the performance of any contract or agreement previously made with the Township or conclusively shown to have failed to perform satisfactorily such contract or agreement with the Township.

Award

Water / Sewer

$122,800.00

Public - City

Renovation, Site Work

7

23

6

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Gaskets
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Excavation and Fill, Backfill
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
468
Active Projects
273
Bidding Soon
4,365
All Active Projects
1,932
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2022

March 20, 2023

img_map_placeholder

Milford Rd & Mc Cole Rd, Middle Smithfield Township, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Pump Station #3 Modifications

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.