Published January 11, 2023 at 7:00 PM

Updated January 25, 2024

Site work and renovation of a municipal facility in Olympia, Washington. Completed plans call for the renovation of a municipal facility.

This project has been awarded to Lincoln Construction. Estimated Bid Cost Range: $444,600.00 to $1,334,550.00 For bid proposals exceeding $1M, each bidder shall submit: Form A (HVAC, Plumbing, and Electrical) with its bid proposal or within one hour after the bid submittal time/date. Form B (Structural Steel Install, Rebar Install) within 48 hours after the bid submittal time/date. Forms A and B must be emailed to: FPSsubcontractorlist@des.wa.gov FPS will be accepting mailed-in or hand-delivered bids. Clearly identify that it is a SEALED BID on the outside of the envelope. Include an attention line in the address to ensure that the bid is routed correctly. The State of Washington prevailing wage rates are applicable for this public works project located in Thurston County. Bidders are responsible to verify and use the most recent prevailing wage rates. The "Effective Date" for this project is the Bid Form due date above. The applicable prevailing wage rates may be found on the Department of Labor & Industries website located at website. Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction contract. Voluntary workforce diversity goals for this apprentice participation are identified in the Instructions to Bidders and the General Conditions for Washington State Facility Construction. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs. In accordance with RCW 39.30.060, if the base bid and the sum of the additive alternates is one million dollars or more, the Bidder is required to provide the names of the Subcontractors with whom the Bidder will directly subcontract for the performance of heating, ventilation and air conditioning (HVAC), plumbing and electrical for this project on Subcontractor List Form A within one hour of the bid submittal time via email to FPSsubcontractorlist@des.wa.gov. The Bidder shall also provide names of the Subcontractors with whom the Bidder will subcontract for structural steel installation and rebar installation on Subcontractor List Form B within 48 hours of the bid submittal time via email to FPSsubcontractorlist@des.wa.gov. Supplemental Bidder Responsibility will be evaluated for this project. In determining Bidder responsibility, the Owner shall consider an overall accounting of the criteria set forth in "DIVISION 00 SUPPLEMENTAL RESPONSIBILITY CRITERIA". Please direct questions regarding this subject to the office of the Consultant. The successful Bidder is required to register and create an account in the DES Diversity Compliance program (B2Gnow) at website. Voluntary numerical Diverse Business goals of 12% MBE, 8% WBE, 5% Washington Small Business, and 5% Veterans have been established for this project. Achievement of the goals is encouraged. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Municipal

$714,000.00

Public - State/Provincial

Renovation, Site Work

53

15

4

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Use of Site, Administrative Requirements, Project Management and Coordination, Project Meetings, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Decking
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Entrances and Storefronts, Balanced Door Entrances, Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Ceilings
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Excavation and Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Manufacturing Equipment, Dies and Molds, Molds, Assembly and Testing Equipment

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
33
Bidding Soon
882
All Active Projects
318
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Capitol Campus Door Access Control - Ext. Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.