Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 29, 2022 at 7:00 PM
Updated January 26, 2024
Renovation of a transportation facility in Miami, Florida. Completed plans call for the renovation of a transportation facility.
Project no - 16-0332 CONTRACT NO. CICC 7360 PLAN Additional Insurance Required: YES If Yes - Minimum Coverage: $1,000,000.00 Performance & Payment Bond Required: YES Bid Bond Required: YES (Contractor must obtain and submit all permits prior to performing any work). The work includes but is not limited to the following: This project involves the removal of the existing wood and steel platform and construction of a new Railcar Cleaning Platform in two (2) phases and all associated site work and improvements as indicated on the contract documents. The work shall be sequenced in two (2) phases in order to allow Rail operations to continue the use of half of the existing wood platform. Phase 1 shall be from grid lines 1 to 18 and Phase 2 is from gridlines 18 to 32, as shown on Exhibit AA. The contractor is responsible to coordinate the work of all subcontractors and suppliers in the most effective manner to diligently complete the work and meet the project schedule. Work required to be accomplished during off hours and weekends as necessary to meet the project schedule or sequencing of the work shall be performed by the Contractor at no additional cost. Estimated Value: $2,754,991 Prevailing Wage Rate Required: Building Construction Davis Bacon: NO Maintenance Wages: SBE-Con. Requirements: YES Percentage: 17.16% SBD Certificate of Assurance Form Required: YES DBE Participation: NO Percentage: 0.00% DBE Subcontractor Forms Required: NO CWP Requirements: NO Percentage: 0.00% SBE-S Requirements NO Percentage: 0.00%
Post-Bid
Transportation Terminals
$2,754,991.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 28, 2022
May 8, 2023
6601 NW 72nd Ave, Miami, FL
Related To This Project
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Nov 22 2022
Miami, FL
Bid Date: Nov 30 2022
Miami, FL
--
Miami, FL
Bid Date: Nov 18 2022
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Dec 05 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
