Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Lincolnshire, Illinois. Completed plans call for the renovation of a educational facility.
Gilbane Building Company, Construction Manager, for and acting on behalf of Stevenson High School District #125 Board of Education, is receiving lump sum proposal forms from interested contractors for the Adlai E. Stevenson High School - 2023 Improvements, Lincolnshire, IL. The work includes both interior and exterior packages. Interior work includes carpet replacement, renovations of a classroom, security office, bookstore, and theater along with mechanical equipment replacement. Exterior work includes brick repair, parking lot work, and refurbishing of tennis courts. All work has a scheduled completion for July 29, 2023. BID RELEASE 1 - BID PACKAGE BP# Description 02A Selective Demolition Work 04A Masonry and Tuckpointing work 05A Structural Steel & Miscellaneous Metals Work 06A General Trades Work 09A Framing and Drywall Work 09B Acoustical Ceilings Work 09C Carpet and Resilient Flooring Work 09E Painting and Wallcoverings Work 11A Theater Rigging Work 21A Fire Protection Work 23A HVAC and Temp Controls Work 26A Electrical Work 31A Site Demo, Earthwork, & Site Utilities Work 32A Asphalt and Concrete Paving Work 32B Landscaping Work Questions regarding the prequalification application procedure should be directed to Yvonda Royster at 312-614-3913 or yroyster@gilbaneco.com. Bid Security in the form of a bid bond in an amount equal to ten percent (10%) of the base bid is required from all Bidders. No other forms of Bid Security will be accepted. Guarantee Bonds in the form of a Performance Bond and Labor and Material Payment Bond in an amount equal to one hundred percent (100%) of the bid will be required from the awarded Bidder. The work will be done in accordance with the Contract Documents. This contract calls for the construction of a "public work," within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. ("the Act"). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the "prevailing rate of wages" (hourly cash wages plus fringe benefits) in the county where the work is performed. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage, notice and record keeping duties. Adlai E. Stevenson High School and Gilbane Building Company reserve the right to reject any or all bids. All information submitted as part of this process shall be considered public information under the State Freedom of Information Act unless specifically disclosed on the applicable information by the Bidder. Challenges to such exemptions shall be defended solely by the Bidder.
Post-Bid
Educational
$200,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 6, 2022
January 6, 2023
1 Stevenson Dr, Lincolnshire, IL
Related To This Project
Lincolnshire, IL
Bid Date: Mar 17 2022
Lincolnshire, IL
Bid Date: Apr 07 2022
Lincolnshire, IL
Bid Date: May 20 2022
Lincolnshire, IL
Bid Date: May 23 2022
Lincolnshire, IL
--
Lincolnshire, IL
Bid Date: May 31 2022
Lincolnshire, IL
--
Lincolnshire, IL
Bid Date: Jun 01 2022
Lincolnshire, IL
Bid Date: Oct 06 2021
Lincolnshire, IL
Bid Date: Oct 28 2022
Lincolnshire, IL
Bid Date: Nov 01 2022
Huntley, IL
Bid Date: Dec 14 2022
Moline, IL
Bid Date: Dec 01 2022
Springfield, IL
Bid Date: Nov 14 2022
Galena, IL
Bid Date: Dec 08 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.