Site work for a water / sewer project in Joliet, Illinois. Completed plans call for site work for a water / sewer project.

**As of January 18, ,2023, , project was awarded to Construction by Camco, awarded amount is $5,204,225.28.* The proposed construction consists of installing approximately 310 lineal feet of 6-inch and 9,930 lineal feet of 8-inch water main, including new hydrant and valves; installing approximately 1,310 lineal feet of 8-inch sanitary sewer and 6 sanitary sewer manholes; and other miscellaneous items of work. The contract will include all work necessary to install the water main, install water service lines via directional drilling or open cut methods, reconnect existing water service lines, restore the roadway, and perform all restoration to return the area to its original condition. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (IEPA). Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to regulations contained in the procedures for issuing loans from the Public Water Supply Loan Program (35 IAC Part 662), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), the Illinois Works Jobs Program Act Apprenticeship Initiative, the Disadvantaged Business Enterprise policy per 40 CFR Part 33, as amended, and the Use of American Iron and Steel requirements as contained in Section 436 of H.R. 3547, the Consolidated Appropriations Act, 2014. This procurement is also subject to loan recipients policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for Bidders and Contractors under this order are explained in 41 CFR 60-4. The City of Joliet Local Bidders Ordinance does not apply to this contract. If at the time the Agreement for this Project is executed, or if during the term of the Agreement, there is excessive unemployment in Illinois as defined in the Employment of Illinois Workers on Public Works Act, 30 ILCS 570/0.01 et seq., as two consecutive months of unemployment exceeding 5%, the Bidder agrees to employ Illinois laborers in accordance with the Employment of Illinois Workers on Public Works Act. An Illinois laborer is defined as any person who has resided in Illinois for at least thirty (30) days and intends to become or remain an Illinois resident. All proposals are subject to the requirements of the City of Joliet Procurement Code (Section 2-430 - 2-453) of the Bidder Instructions. All Bids must be accompanied by a Bidders bond, certified check, bank cashiers check or bank draft payable to the City of Joliet for ten percent 10% of the total amount of the Bid as provided in the Bidder Instructions. Direct all questions about the meaning or intent of the Bidding Documents to the Engineer Mike Kenny (mkenny@baxterwoodman.com). The Council reserves the right to reject any or all Bids and to waive technicalities. Unless the Bids are rejected for good cause, award of contract shall be made to the lowest responsible and responsive Bidder. MBE (20.9%), WBE (6.9%)

Award

Water / Sewer

$5,204,255.00

Public - City

Site Work

35

18

15

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Compaction, Erosion and Sedimentation Controls, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Machining Equipment, Drilling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
113
Bidding Soon
2,225
All Active Projects
984
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2022

July 1, 2023

img_map_placeholder

Multiple Locations, Joliet, IL


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

St. Pat's Phase 1B Water Main Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.