Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a swimming pool in Warrington, Pennsylvania. Completed plans call for the renovation of a swimming pool.
This is a multi-prime bid. Questions during the bidding process shall be submitted by RFI format through Portal. If additional information is required concerning these bids, contact Thomas Hanna, P.E. at the Central Bucks School District Operations Center, 320 West Swamp Road, Doylestown, PA 18901, or by phone (267) 893-4013. CLARIFICATION DEADLINE: 11/23/2022 12:00 PM. Proposals shall conform to all other requirements as more fully set forth in the bidding documents. The Central Bucks School Board reserves the right to reject any or all bids, waive any informality in any bid, to eliminate or reduce quantities, and exercise its judgment as to the comparative merit of the products and services offered. The Work generally consists of the following, but refer to the drawings and specifications for the complete scope of work: 1. Demolition of existing pool packaged air handling units and associated controls, piping, ductwork, hangers and supports. 2. Demolition of existing split system condensing units and associated piping, refrigerant, controls, hangers and supports. 3. Demolition of existing reheat boiler (to be turned over to owner), and associated flue, controls and piping 4. Limited demolition of existing boiler room hot water piping, heat exchangers, expansion tanks, valves, pumps, fittings, and controls. 5. Alternate Bid: Demolition of existing pool lighting. 6. Demolition of existing rooftop solar heating panels and associated piping and pumps. 7. Rooftop cutting and patching for existing and new penetrations. 8. Installation of new structural elements to support the new exhaust fan, rooftop units, condensing units and ductwork. 9. Installation of new pool roof top packaged units, associated piping, ductwork and controls. 10. Installation of new remote condensing units, associated piping and controls. 11. Installation of new return air and supply air ductwork, including painting to match existing. 12. Installation of new pool exhaust system, including ductwork and roof exhaust fan. 13. Installation of new boilers, boiler room hot water piping, heat exchangers, expansion tanks, valves, controlled valves, pumps, fittings, and controls. 14. Painting of pool area, including cleaning and patching of noted areas. 15. Installation of doors and storefront window system and new door hardware & weather stripping. 16. Alternate Bid: Installation of new pool lighting phase via existing hot water circulation loop from winter boiler plant. Provide all associated system isolation and draining from removed summer boiler system. b. Electrical Contractor to remove all associated power to demolition mechanical equipment per contract documents. c. General contractor shall patch roof openings where solar heat piping has been removed. 2. Phase 2 - Full Construction: May 30, 2023 - September 1, 2023: a. Balance of all mechanical, electrical and general construction work shown on the drawings and outlined in the specifications. Project shall be substantially completed by 9/1/23
Bid Results
Swimming Pools
$69,050.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 6, 2022
January 10, 2023
1100 Folly Rd, Warrington, PA
Related To This Project
Warrington, PA
Bid Date: Dec 07 2022
Warrington, PA
Bid Date: Dec 20 2022
Warrington, PA
Bid Date: Oct 15 2018
Warrington, PA
Bid Date: Jun 08 2018
Warrington, PA
Bid Date: May 16 2022
Warrington, PA
Bid Date: Apr 14 2022
Warrington, PA
Bid Date: Sep 09 2021
Warrington, PA
Bid Date: May 17 2022
Warrington, PA
--
Warrington, PA
Bid Date: Aug 23 2022
Warrington, PA
Bid Date: Aug 19 2021
Warrington, PA
Bid Date: Aug 18 2022
Warrington, PA
Bid Date: Aug 17 2022
Warrington, PA
Bid Date: Sep 09 2022
Warrington, PA
Bid Date: Nov 10 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.