BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 24, 2022 at 7:00 PM

Updated January 26, 2024

Site work and new construction of an educational facility in Salt Lake City, Utah. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Project description: This project consists of the new construction student housing and office space as part of the Impact and Prosperity Epicenter complex on the University of Utah campus. This will be a 6 level concrete building with a 3 story steel building. The new facility will be approximately 285,000 gross square feet. This is a DFCM Building. Bid Package #2 - Finish Package includes the following scopes: DIVISIONS 05 - 14 Alternates #1-4 See Specification Section 01 23 00 Alternate No. 01: Spray-Applied Acoustical Insulation, at metal deck Alternate No. 02: Spray-Applied Acoustical Insulation, at metal deck and wood ceiling system. Alternate No. 03: Spray-Applied Acoustical Insulation, at concrete slab. Alternate No. 04: Landscape scope of work. Questions due on the 11-18-22 See detail project schedule in the project documents. Construction has started and will finish at the end of 2024. All question to be directed to Rich Evans. rich.evans@okland.com *The value reflects that of the overall project and not this specific package.

Post-Bid

Educational

$59,712,303.00

Public - State/Provincial

New Construction, Site Work

823

37

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
80
Bidding Soon
1,056
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2022

January 30, 2023

Project location map

1701 Student Life Way, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.