Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 6, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Whittier, Alaska. Conceptual plans call for site work for a water / sewer project.
This project will support current and future commercial, recreational and tourism development at the Head of Passage Canal (HOB) including a new cruise ship terminal and proposed new small boat harbor. This development is designed to accommodate a large hotel and may include single and multi-family housing units upon completion. The HOB consists of unconsolidated glacial materials similar to that of the Whittier townsite and has streams fed by both Learnard Glacier and Shakespeare Glacier. The unconsolidated materials and presence of glaciers make it likely that wells with the ability to provide significant quantities of groundwater can be developed. The presence of several existing wells at the HOB bolsters this assessment. Development of a well site will be in an area up-gradient from potential sources of contamination and away from possible saltwater intrusion. The danger of avalanches will be considered in locating water system components. Wells will be sized and developed to ADEC requirementsto have a minimum capacity of 500 gpm. A water storage tank is required to supply domestic water demands and fire flows and to minimize well pumping operations. The tank will be located at an adequate elevation to provide gravity flows to the entire distribution system, approximately 230 feet above mean sea level. The bank will be sized for 450,000 gallons to accommodate domestic and fire demands. The project is expected to include two municipal wells, well house facility, water storage tank and water distribution system. The water system will have 4,000 feet of water mains, at least four fire hydrants, and water services. Project is included City of Whittier FY 2023 - 2027 Budget CIP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$4,990,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2026
To Be Determined, Whittier, AK
Related To This Project
Whittier, AK
--
Whittier, AK
Bid Date: Mar 18 2024
Whittier, AK
--
Whittier, AK
Bid Date: Apr 25 2024
Whittier, AK
--
Whittier, AK
Bid Date: Nov 07 2025
Whittier, AK
--
Whittier, AK
Bid Date: Feb 11 2020
Whittier, AK
--
Whittier, AK
Bid Date: Feb 03 2023
Whittier, AK
--
Whittier, AK
--
Anchorage, AK
Bid Date: Jul 16 2023
Kenai, AK
Bid Date: Jul 25 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
