BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Granite Quarry, North Carolina. Completed plans call for the renovation of a educational facility.

The Work generally consists of HVAC renovations at Granite Quarry ES, Morgan ES, Southeast MS, & East Rowan HS as described below: Granite Quarry ES - Add three packaged dedicated outside air units to provide ventilation to classrooms in the building. The units are located on grade and are equipped with DX cooling, electric heat, and energy recovery. Add three split system dedicated outside air units to serve ducted fan coil units in the classroom wings. The associated condensing units are located on grade. 118 S. Walnut GQ St, Salisbury, NC 28146. Morgan ES - Replacement of one split air handling unit equipped with DX cooling and hot water heating. The air handling unit is located on an equipment mezzanine and the condensing unit is located on grade. 3860 Liberty Road, Gold Hill, NC 28071. Southeast MS - Replacement of two split dedicated outside air units and associated condensing units. The air handling units are located on an equipment mezzanine and the condensing units are located on grade. 1570 Peeler Road, Salisbury, NC 28146. East Rowan HS - Add seven packaged dedicated outside air units to provide ventilation to the classrooms in the building. The units are equipped with DX cooling, electric heat, and energy recovery. The units are located on the roof and the ventilation air will be ducted on the roof to each space. 175 St. Luke's Church Rd, Salisbury, NC 28146. Bids received after the announced time and date for submittal, whether by mail or otherwise, will be rejected. Bidders are responsible for ensuring their Bid is received before the deadline indicated. Bids submitted by telephone, telegraph, email, text message, or facsimile shall not be accepted. This project is federally funded through the Elementary and Secondary School Emergency Relief Fund (ESSER Fund) and is subject to the Davis Bacon General Wage requirements. Submit questions electronically. Responses will be in the form of addenda if required. Refer to the Instructions to Bidders for bidding procedures and requirements. All bidders are hereby notified that they shall be properly licensed under the state laws governing their trades. Each bid shall be accompanied by a bid bond in an amount equal to not less than five percent (5%) of the gross amount of the bid. Performance Bond and Labor and Materials Payment Bond in the amount of the contract are required. No bid may be withdrawn after receipt of Bids for a period of sixty-one (61) calendar days. The Owner reserves the right to reject any or all Bids, to accept any bid submitted, to waive any formalities and negotiate with the low Bidder or Bidders any changes considered necessary or desirable. Southeast MS - Replacement of two split dedicated outside air units and associated condensing units. The air handling units are located on an equipment mezzanine and the condensing units are located on grade. 1570 Peeler Road, Salisbury, NC 28146. East Rowan HS -Add seven packaged dedicated outside air units to provide ventilation to the classrooms in the building. The units are equipped with DX cooling, electric heat, and energy recovery. The units are located on the roof and the ventilation air will be ducted on the roof to each space. 175 St. Luke's Church Rd, Salisbury, NC 28146 Granite Quarry ES - Add three packaged dedicated outside air units to provide ventilation to classrooms in the building. The units are located on grade and are equipped with DX cooling, electric heat, and energy recovery. Add three splitsystem dedicated outside air unitsto serve ducted fan coil units in the classroom wings. The associated condensing units are located on grade. 118 S. Walnut GQ St, Salisbury, NC 28146. Morgan ES - Replacement of one split air handling unit equipped with DX cooling and hot water heating. The air handling unit is located on an equipment mezzanine and the condensing unit is located on grade. 3860 Liberty Road, Gold Hill, NC 28071. Bid Result Total Base Bid for Knollwood ES - Miles-McClellan Construction Company, Inc. - $1,477,000 Total Base Bid for China Grove MS - Miles-McClellan Construction Company, Inc. - $3,278,000 Total Base Bid for Corriher-Lipe MS - Miles-McClellan Construction Company, Inc. - $3,600,000 Total Base Bid for South Rowan HS - Miles-McClellan Construction Company, Inc. - $5,396,000

Bid Results

Educational

$13,751,000.00

Public - County

Renovation

102

17

47

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
23
Bidding Soon
1,062
All Active Projects
409
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2022

January 6, 2023

img_map_placeholder

Multiple Locations, Granite Quarry, NC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.