BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a development in East Bethel, Minnesota. Working plans call for the addition of a development; for site work for a development; and for the demolition of a development.

The owner has selected a Design Builder. A timeline for construction has not yet been established. Design-Build Services for classroom expansion at the Cedar Creek Ecosystem Science Reserve's Lindeman Research and Discovery Center. The Cedar Creek Ecosystem Science Reserves Lindeman Research and Discovery Center aims to advance the understanding of natural systems through ecological research. Community engagement is important to their mission, informing environmental policies and promoting biodiversity conservation. The programs have grown over the past decade, now serving over seven thousand K-12 students on ecological field trips each year. With this substantial increase, the amount of student visitors exceeds current classroom spaces and restroom spaces are limited. 1. Program Description - The University is requesting design services for a one classroom addition to the existing Lindeman Center, including restrooms and support space. With students ranging from kindergarten through high school, the classrooms should be designed with flexibility and universal design in mind. Modifications to the existing building will be limited to the circulation connection. 2. Impact Analysis - The addition is not expected to include sprinkler systems, but may be expected to satisfy storm shelter requirements. Further definition in Pre design is required. Respondent should include a new septic system to serve the new fixtures. Scopes of services will include all services and deliverables necessary to complete a Pre design (Programming), Schematic Design, Design Development, Construction Documents, Bidding/ Negotiation and Construction Administration. Establish a preliminary scope of work/ statement, construction cost estimate and implementation/ phasing schedule for the project. Deadline for RFP Questions November 21, 2022 at Noon

Pre-Construction/Negotiated

Conservation and Development

$2,390,000.00

Public - State/Provincial

Addition, Demolition, Site Work

1

9

6

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
81
Bidding Soon
741
All Active Projects
300
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2022

November 1, 2023

img_map_placeholder

2660 Fawn Lake Dr NE, East Bethel, MN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.