Published November 30, 2022 at 7:00 PM

Updated February 14, 2024

Site work and paving for a mixed-use development in Ankeny, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The NW Northlawn Area Utility Improvements - Phase 2 project includes the replacement of PCC street pavement, sanitary sewer, water main, and storm sewer located on NW Scott Street from NW 2nd Street to approximately 600 feet north of NW 4th Street in the Northlawn neighborhood in the City of Ankeny. The improvements include approximately 3,500 SY of 8" thick PCC street pavement, 250 SY of 7" thick PCC street pavement, 1,100 LF of sanitary sewer, 1,200 LF of water main, 1,800 LF of storm sewer, 2,000 LF of footing drain collector, Class 10 excavation, subgrade preparation, modified subbase, and removal and replacement of streets, driveways, and sidewalks. Other associated improvements include temporary water main, temporary sidewalk, temporary traffic control, erosion control, temporary surface restoration, and miscellaneous associated work necessary to complete the project. The Contractor shall substantially complete the overall project in one hundred forty (140) working days. Substantial completion for the overall project shall be defined as all utility, grading, and pavement construction completed, with the new streets, driveways, and sidewalks fully open to traffic. A mandatory six-day work week is required and working days will be charged on Saturdays. Should the Contractor fail to substantially complete the work in this timeframe, liquidated damages of One Thousand, Five Hundred Dollars ($1,500.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). An enhancement of payment in the amount of Forty Thousand Dollars ($40,000.00) will be issued to the Contractor if substantial completion for the overall project is achieved on or before Saturday, September 23, 2023. This fee is refundable, provided the following conditions are met: (1) The Contract Documents are returned complete and in a good usable condition. (2) They are returned within fourteen (14) calendar days after the award of the project. An individual must call 515-964-2020 in advance to reserve a paper copy.

Bid Results

Water / Sewer

$2,027,500.00

Public - City

Paving, Site Work

66

6

10

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
104
Bidding Soon
1,161
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2022

January 30, 2023

Project location map

Multiple Locations, Ankeny, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.