Published July 26, 2023 at 8:00 PM

Updated January 26, 2024

Site work, paving and outdoor lighting for a mixed-use development in Fairburn, Georgia. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

As of July 24, 2023, the project has been awarded. A timeline for construction has not been established at this time. The City of Fairburn will accept sealed bids from qualified Contractors for furnishing all labor, equip-ment, and materials necessa1y to complete the VIRLYN B. SMITH ROAD PEDESTRIAN IM-PROVEMENTS PROJECT #23-003. The work includes the removal of existing curb & gutter, sidewalk and driveway aprons, installation of new sidewalk, replacement of existing sidewalk as re-quired, installation of new driveway aprons, installation of new curb & gutter as required, and the installation of new ADA handicap ramps. This contract will also include preparation of sub-grade, saw-cutting and demolition of existing asphalt and concrete, as well as clean up and backfilling. The scope of work will be conducted on the west side on Virlyn B. Smith Road, from Rive11own Road to the SR 14/US 29 access ramp. Add Alternate #I consists of the installation pedestrian lighting within the project limits. All work must be completed within one hundred and fifty (150) calendar days of the Notice to Proceed with Construction (NTP). No bid may be modified, withdrawn, or canceled for a period of 60 days after time designated for receipt of Bids or until notified by Owner, whichever is sooner. The City reserves the right to reject any and all bids and to waive irregularities, technicalities, and informalities. Questions of a technical nature should be submitted in writing to the City of Fairburn via electronic mail, to the procurement inbox: procurement@fairburn.com. Completion Date: 150 Calendar Days *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Roads / Highways

$868,475.00

Public - City

Outdoor Lighting, Paving, Site Work

31

4

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
297
Active Projects
165
Bidding Soon
2,345
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2022

January 13, 2023

Project location map

Virlyn B Smith Rd, Fairburn, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.