BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2024 at 8:00 PM

Updated September 10, 2024

This is a service / maintenance or supply contract in Boston, Massachusetts. Contact the soliciting agency for additional information.

As of September 9, 2024, a consultant has been awarded. *The closed solicitation has been included below for reference: Flood Resilience Mitigation Planning & Feasibility Study for Long Wharf This project is to analyze site conditions and develop implementable design options to contribute to the protection of Long Wharf from future sea level rise and coastal storm events. Specified Services(all chosen) Planner Engineer Project Manager For additional information please reach out to the project manager Dolores Fazio at 617-918-6209 or at dolores.fazio@boston.gov Designer Fee Set Fee $800,000 Time Period for Completed Project 12 Months The Method of Contractor Selection has not been determined at this Time.

Award

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
567
Active Projects
316
Bidding Soon
4,119
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.