Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in San Bernardino, California. Completed plans call for site work for a road / highway.
**As of January 6, ,2023, , this project has not yet been awarded. The project is expected to be awarded around April.** The San Bernardino County Transportation Authority (SBCTA) will utilize the services of CONSULTANT to support the construction activities for the Project. The CONSULTANT will provide construction management, materials testing, and construction surveying for the Project. A description of the Project is given below. This project proposes to construct improvements to Mount (Mt.) Vernon Avenue at the Interstate 10 (I-10) Interchange to improve traffic operation as well as improve bicycle and pedestrian access along Mt. Vernon Avenue through the interchange. The Mt. Vernon Avenue Interchange on I-10 is in the City of Colton in San Bernardino County. The project limits along I-10 begin at the 9th Street (St.) Interchange Post Mile (PM) R22.7 to the west and end at the I-215 Interchange PM R24.3. The project area extends along Mt. Vernon Avenue approximately 540 feet north of the existing freeway centerline and approximately 640 feet south of the existing freeway centerline at the Union Pacific Railroad (UPRR) bridge overcrossing. SBCTA intends to advertise, award and administer one construction contract for this project. The successful consultant firm will provide the construction management and support services. Project Type RFP (Request for Proposal) Response Types Response File Type of Award Lump Sum Online Q&A Yes Q&A Deadline 11/21/2022 4:00 PM (PST) Pre-Bid Meeting Info: Dial by your location +1 669 444 9171 US +1 669 900 6833 US (San Jose) +1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) +1 646 931 3860 US +1 929 436 2866 US (New York) +1 301 715 8592 US Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% This project proposes to construct improvements to Mount (Mt.) Vernon Avenue at the Interstate 10 (I-10) Interchange to improve traffic operation as well as improve bicycle and pedestrian access along Mt. Vernon Avenue through the interchange. The Mt. Vernon Avenue Interchange on I-10 is in the City of Colton in San Bernardino County. The project limits along I-10 begin at the 9th Street (St.) Interchange Post Mile (PM) R22.7 to the west and end at the I-215 Interchange PM R24.3. The project area extends along Mt. Vernon Avenue approximately 540 feet north of the existing freeway centerline and approximately 640 feet south of the existing freeway centerline at the Union Pacific Railroad (UPRR) bridge overcrossing. The existing Mt. Vernon Avenue, through the interchange has four striped lanes, which transitions to three striped through lanes north of the eastbound ramps. The Build Alternative (Preferred Alternative) will accommodate four continuous through lanes through the interchange, two additional left turn lanes in the northbound direction, and bike lanes in both directions. The Mt. Vernon Avenue overcrossing structure will be reconstructed to accommodate the widening on Mt. Vernon Avenue and the future widening of the I-10 freeway to its ultimate configuration. The City of Colton has a separate project which will widen Mt. Vernon Avenue from two through lanes to four through lanes from the I-10 eastbound ramps to approximately 300 feet south of the intersection. This project will further widen the southern leg of the intersection to accommodate a northbound dedicated left turn lane to E. Mission Street. North of the bridge, the existing five-leg intersection connecting Mt. Vernon Avenue and East Valley Boulevard to the I-10 westbound on-ramp, would be realigned with exclusive turn lanes, signalization, and signage improvements incorporated to improve traffic operations. The existing westbound on-ramp and eastbound off-ramp are proposed to be modified to accommodate the wider and taller bridge structure. The project also addresses bicycle and pedestrian modes of travel. Specifically, it would upgrade bicycle access from Class III to Class II bike lane with striped buffer in each direction through the interchange. For pedestrians, it would add a sidewalk on the northeastern side of the bridge and address Americans with Disabilities Act (ADA) access with up-to-date curb ramps. Improvements to the Mt. Vernon Avenue at the I-10 Interchange will be funded by San Bernardino County Transportation Authority (SBCTA) and the City of Colton as part of the Measure I Program. The project is part of the Valley Interchange Program identified in the Measure I Ordinance approved by San Bernardino County voters in 2004.
Post-Bid
Roads / Highways
$400,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 13, 2022
April 3, 2023
S Mt Vernon Ave, San Bernardino, CA
Related To This Project
San Bernardino, CA
Bid Date: Dec 01 2022
San Bernardino, CA
Bid Date: Nov 30 2022
San Bernardino, CA
Bid Date: Dec 01 2022
San Bernardino, CA
Bid Date: Nov 18 2022
San Bernardino, CA
Bid Date: Oct 15 2019
San Bernardino, CA
Bid Date: Dec 15 2022
San Bernardino, CA
Bid Date: Sep 30 2022
San Bernardino, CA
Bid Date: Dec 16 2022
San Bernardino, CA
Bid Date: Dec 08 2022
San Bernardino, CA
Bid Date: Mar 10 2022
San Bernardino, CA
Bid Date: Aug 10 2022
San Bernardino, CA
Bid Date: Nov 18 2022
San Bernardino, CA
Bid Date: Jan 09 2023
San Bernardino, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.