BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in San Bernardino, California. Completed plans call for site work for a road / highway.

**As of January 6, ,2023, , this project has not yet been awarded. The project is expected to be awarded around April.** The San Bernardino County Transportation Authority (SBCTA) will utilize the services of CONSULTANT to support the construction activities for the Project. The CONSULTANT will provide construction management, materials testing, and construction surveying for the Project. A description of the Project is given below. This project proposes to construct improvements to Mount (Mt.) Vernon Avenue at the Interstate 10 (I-10) Interchange to improve traffic operation as well as improve bicycle and pedestrian access along Mt. Vernon Avenue through the interchange. The Mt. Vernon Avenue Interchange on I-10 is in the City of Colton in San Bernardino County. The project limits along I-10 begin at the 9th Street (St.) Interchange Post Mile (PM) R22.7 to the west and end at the I-215 Interchange PM R24.3. The project area extends along Mt. Vernon Avenue approximately 540 feet north of the existing freeway centerline and approximately 640 feet south of the existing freeway centerline at the Union Pacific Railroad (UPRR) bridge overcrossing. SBCTA intends to advertise, award and administer one construction contract for this project. The successful consultant firm will provide the construction management and support services. Project Type RFP (Request for Proposal) Response Types Response File Type of Award Lump Sum Online Q&A Yes Q&A Deadline 11/21/2022 4:00 PM (PST) Pre-Bid Meeting Info: Dial by your location +1 669 444 9171 US +1 669 900 6833 US (San Jose) +1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) +1 646 931 3860 US +1 929 436 2866 US (New York) +1 301 715 8592 US Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% This project proposes to construct improvements to Mount (Mt.) Vernon Avenue at the Interstate 10 (I-10) Interchange to improve traffic operation as well as improve bicycle and pedestrian access along Mt. Vernon Avenue through the interchange. The Mt. Vernon Avenue Interchange on I-10 is in the City of Colton in San Bernardino County. The project limits along I-10 begin at the 9th Street (St.) Interchange Post Mile (PM) R22.7 to the west and end at the I-215 Interchange PM R24.3. The project area extends along Mt. Vernon Avenue approximately 540 feet north of the existing freeway centerline and approximately 640 feet south of the existing freeway centerline at the Union Pacific Railroad (UPRR) bridge overcrossing. The existing Mt. Vernon Avenue, through the interchange has four striped lanes, which transitions to three striped through lanes north of the eastbound ramps. The Build Alternative (Preferred Alternative) will accommodate four continuous through lanes through the interchange, two additional left turn lanes in the northbound direction, and bike lanes in both directions. The Mt. Vernon Avenue overcrossing structure will be reconstructed to accommodate the widening on Mt. Vernon Avenue and the future widening of the I-10 freeway to its ultimate configuration. The City of Colton has a separate project which will widen Mt. Vernon Avenue from two through lanes to four through lanes from the I-10 eastbound ramps to approximately 300 feet south of the intersection. This project will further widen the southern leg of the intersection to accommodate a northbound dedicated left turn lane to E. Mission Street. North of the bridge, the existing five-leg intersection connecting Mt. Vernon Avenue and East Valley Boulevard to the I-10 westbound on-ramp, would be realigned with exclusive turn lanes, signalization, and signage improvements incorporated to improve traffic operations. The existing westbound on-ramp and eastbound off-ramp are proposed to be modified to accommodate the wider and taller bridge structure. The project also addresses bicycle and pedestrian modes of travel. Specifically, it would upgrade bicycle access from Class III to Class II bike lane with striped buffer in each direction through the interchange. For pedestrians, it would add a sidewalk on the northeastern side of the bridge and address Americans with Disabilities Act (ADA) access with up-to-date curb ramps. Improvements to the Mt. Vernon Avenue at the I-10 Interchange will be funded by San Bernardino County Transportation Authority (SBCTA) and the City of Colton as part of the Measure I Program. The project is part of the Valley Interchange Program identified in the Measure I Ordinance approved by San Bernardino County voters in 2004.

Post-Bid

Roads / Highways

$400,000.00

Public - County

Site Work

184

9

5

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
473
Active Projects
216
Bidding Soon
3,537
All Active Projects
1,617
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 13, 2022

April 3, 2023

img_map_placeholder

S Mt Vernon Ave, San Bernardino, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.