BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 14, 2022 at 7:00 PM

Updated January 25, 2024

Renovation of an educational facility in San Jose, California. Completed plans call for the renovation of a educational facility.

Exterior Door Replacement at Morrill Middle School Start Date: Summer 2023 LAST DAY TO SUBMIT PRE-BID QUESTIONS OR RFI'S: December 7, 2022 CONTRACTOR PREQUALIFICATION REQUIRED: NO LICENSING REQUIRED: Class B The District shall award the Contract, if it awards it at all, to the lowest responsive and responsible bidder based on: Base Bid The Board of Trustees reserves the right to waive any irregularities, accept or reject any or all bids, and be the sole judge of merit and suitability of the workmanship and materials.

Post-Bid

Educational

$250,000.00

Public - City

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
369
Active Projects
197
Bidding Soon
2,760
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2022

January 16, 2023

Project location map

1970 Morrill Ave, San Jose, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.