BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Osage Beach, Missouri. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This Project is to add ADA compliant sidewalks along Hwy 42, from Columbia Avenue to the School of the Osage Drive. This project is part of the City's long-term goal to provide sidewalks throughout the city to encourage walking and safety. The purpose of this project is to construct approximately 4,500 linear feet of sidewalk, where none currently exists. This project will provide a much-needed ADA compliant pedestrian facility for the many residents and school children in this area. Specifically, this project will connect sidewalks from residential neighborhoods along Columbia Avenue to the School of the Osage Middle School, Osage Upper Elementary School, and the Osage High School. The goal of this project is to encourage walking and safety between the numerous activity centers and schools in the area. The specific scope of project consists of linear grading, new ADA compliant sidewalks where none currently exist, ADA compliant concrete entrances, restoration, and construction traffic control. The Engineering responsibilities may include but are not limited to: The preparation of Conceptual plans, Preliminary plans, Contract plans, Right of Way Plans, preparing and submitting necessary permits, contract documents, assisting with the bidding process for ADA compliant sidewalks and preparation of PS&E and final documents.Construction Phase: work with contractor on behalf of the County/City, assist with preconstruction conference, perform periodic site inspection, prepare change orders, inspect construction materials, check shop drawings submitted by contractor, conduct construction test and inspection, be present during critical construction operations, work with City to do inspections and reporting and participate in final inspection. The method of Contractor Selection has not been Determined at this time.

Conceptual

Sidewalks / Parking Lot

$607,488.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
25
Bidding Soon
388
All Active Projects
162
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2023

img_map_placeholder

State Hwy 42, Osage Beach, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.