BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 25, 2023 at 7:00 PM

Updated September 10, 2024

Site work and outdoor lighting for a transportation facility in Seattle, Washington. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.

Site preparation including tree protection, temporary erosion and sediment control and clearing and grubbing. Trenchless construction and trenching for installation of electrical conduit. Installation of trail lighting including but not limited electrical service cabinet, handholes, light foundations, poles and luminaires, and wiring. Excavation for and construction of concrete sidewalk, retaining walls, and stairways. Installation of storm drain utilities including pavement removal and restoration for connections to existing mains. Fabrication and installation of handrails and guardrails. Restoration of disturbed areas including existing irrigation systems. Restoration includes soil preparation, placement of topsoil, seeding and planting. Additive #1: Installation of seven light poles and luminaires as indicated on the Contract Drawings. Clarification Deadline: 11/30/2022 11:00 AM. Additive #2: Installation of an electrical service cabinet in the Hiawatha Pl Street end and handholes and conduit to support future lighting of the sport court near 23rd Avenue S. Ordinance Number(s): 126237& 126047 Specification Number: 2074 PW # 2021-058 PRK #PRK730309-05& PRK732416-39 Deadline for Contractor questions regarding this Parks project shall be submitted by close of business on Wednesday, NOVEMBER 30 TH, 2022 to the Parks project manager via Zain.Aldahlaki@seattle.gov

Award

Transportation Terminals

$2,684,485.00

Public - City

Outdoor Lighting, Site Work

53

19

7

7

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
85
Bidding Soon
1,726
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.