BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

This is a service / maintenance or supply contract in Sikeston, Missouri. Contact the soliciting agency for additional information.

The City of Kirksville, Missouri, is hereby soliciting statements of qualifications and experience from qualified consultants for airfield engineering and development projects at Kirksville Regional Airport. The selected consultant will provide services for the next 5 years. Projects may be subject to future receipt of Federal funding under the Federal Aviation Administration (FAA) Airport Improvement Program, as administered by the Missouri Department of Transportation (MoDOT) through the State Block Grant Program (SBGP). These projects may include the following: 1. Development of an Airport Layout Plan (ALP) and Narrative or Master Plan. Estimated cost $300,000 2. Preparation of a Certificate of Title, including an Exhibit "A" Property Map. Estimated cost $30,000 3. Environmental assessment. Estimated cost $100,000 The required services include, but are not limited to, engineering services for preliminary, design, bidding, and construction phases and incidental special services including geotechnical, preparing categorical exclusion documentation, as-built ALP updates, and surveying. The consultant should provide the name(s) of preferred firm(s) for any work which is likely to be sub-consulted. Sub-consultant changes can occur with Sponsor approval. At the sponsor's discretion, this selection can be retained for projects initiated within five years or until all projects are complete. Projects other than those listed above will require a new solicitation except as allowed in FAA Advisory Circular 150/5100-14 paragraph 2.7.2 (4). Disclosure: Under a previous agreement, Waters Engineering assisted the Sponsor with preparation of their CIP and the above cost estimates. Fees will be negotiated for projects as federal funds become available. Consultants shall not include fee or cost information when responding to this solicitation. Prospective consultants are advised that applied overhead rates must be in accordance with the cost principles established within Federal Regulation 48 CFR Part 31, Contract Cost Principles and Procedures. After selection, the successful firm will be required to submit a copy of its current overhead rate audit certification or MoDOT pre-qualification. The agreement(s) between the Sponsor and the selected consultant will be subject to all applicable Federal Rules and Regulations as identified in AC 150/5100-14E. The most current version of the Federal Contract Provisions for A/E agreements will be included in each agreement. The agreement(s) between the Sponsor and the selected consultant will be subject to all applicable Federal Rules and Regulations as identified in AC 150/5100-14E. The most current version of the Federal Contract Provisions for A/E agreements will be included in each agreement. Qualifications shall be delivered by mail or hand-delivered to the following address, City Clerk, 201 South Franklin Street, Kirksville, Missouri 63501. The package containing the qualifications shall be plainly marked "Request for Qualification for Airport Consultant Services." The consultant should also provide an affidavit of compliance with the federal work authorization program and a copy of the firm's E-Verify Memorandum of Understanding. Questions regarding this solicitation can be directed to Glenn Balliew at 660-627-1291 or gballiew@kirksvillecity.com. The City of Kirksville does not discriminate in its decisions on the basis of age, ancestry, color, disability, gender, gender identity, marital status, national origin, race, religion, sexual orientation, or on any other basis that would be in violation of any applicable federal, state, or local law. The method of contractor selection has not been determined at this time. MODOT - RFQ Design - Kirksville Regional Airport Airfield, Development Planning Consultants

Conceptual

Transportation Terminals

$430,000.00

Public - City

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
26
Bidding Soon
326
All Active Projects
113
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2023

img_map_placeholder

Multiple Locations, Sikeston, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.