Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 11, 2022 at 7:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Cedar Park, Texas. Contact the soliciting agency for additional information.
The City of Cedar Park requests Proposals/Quotations for 3rd party inspection/ observation services for the construction of the Brushy Creek North Fork Trail Project The Brushy Creek North Fork Trail Project generally includes approximately three (3) miles of ten (10) feet wide field engineered concrete trail and all necessary appurtenances including, but not limited to fencing, culverts, end treatments, handrails, grading, embankment, and retaining walls. The general path of the trail will start at Parmer Ln (just south of Whitestone Blvd) and follow the north fork of Brushy Creek down to Brushy Creek Rd where it will connect to the existing Brushy Creek Regional Trail. Basic plans will be provided, but the project will be field engineered to determine the final alignment of the trail within the provided easements. The intent of the field engineering is to avoid trees when feasible and follow the topography of the area while causing as little impact to the natural landscape and floodplain as possible and providing a structurally sound shared use path to the public. There will be limited access points and constrained construction boundaries along large portions of the trail project. The inspector will be expected to help ensure the contractor abides by the project constraints. Questions shall be directed to the Engineering and Capital Projects Department via appointment, telephone or email. Plans may be made available for review by appointment. Please contact Marisa McKnight at 512-401-5364 or marisa.mcknight@cedarparktexas.gov. The City reserves the right to negotiate with any and all persons or firms. The City also reserves the right to reject any and all proposals/quotations, or accept any proposal/quotation deemed most advantageous, or to waive any irregularities or informalities in the proposal/quotation received, and to revise the process schedule as circumstances require. The Method of Contractor Selection has not been determined at this Time.
Conceptual
Roads / Highways
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 30, 2023
Brushy Creek North Fork Trail, Cedar Park, TX
Related To This Project
Cedar Park, TX
--
Cedar Park, TX
--
Cedar Park, TX
Bid Date: Mar 29 2022
Cedar Park, TX
--
Cedar Park, TX
--
Cedar Park, TX
--
Cedar Park, TX
Bid Date: Aug 15 2025
Cedar Park, TX
--
Cedar Park, TX
--
Cedar Park, TX
--
Cedar Park, TX
--
Cedar Park, TX
--
Cedar Park, TX
--
Cedar Park, TX
--
Cedar Park, TX
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
