Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 18, 2025 at 8:00 PM
Updated August 19, 2025
Site work and paving for a mixed-use development in Cedar Park, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
North Section - Reconstruction and widening of approx. 3,100 LF of Toro Grande Boulevard from RM 1431 (Whitestone Blvd) to New Hope Drive. This section includes completion of southbound lanes, removal of medians, relocation/replacement of street lights from the median to the shoulders, storm drain, water/wastewater, resurfacing of existing asphalt and pavement markings. Development of the southbound lanes to accommodate commercial development and maintain existing business access is a priority. South Section - New construction of approx. 1,600 LF of Toro Grande Boulevard from RM 1431 (Whitestone Blvd.) to a new roadway roundabout at "Commerce Street" and approx. 4,000 LF of "Commerce Street" connecting to FM 734 (Parmer Ln). This section includes a 4-lane divided roadway with raised medians, a bridge structure with aesthetic enhancements and overlooks over Brushy Creek, a new signalized intersection at Parmer Ln, streetlights, storm drain infrastructure, water/wastewater, shared use path/sidewalks, pedestrian connection to the Brushy Creek North Fork Trail, turn lane construction on FM 734 (Parmer Ln.) and reconfiguration on RM 1431 (Whitestone Blvd.), signal modification on RM 1431 (Whitestone Blvd.), asphalt paving, and pavement markings. Development of the section between RM 1431 (Whitestone Blvd.) and the bridge structure to accommodate commercial development is a priority. The estimated total base construction budget for this project is $29,275,000 and the not to exceed duration is 610 calendar days. Each PROPOSAL must be accompanied by Proposal Security made payable to OWNER in an amount of five percent (5%) of PROPOSER's total amount Proposal and in the form of a certified or cashier's check or a Bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions Question Deadline 08/08/2025 at 5:00 PM CT The deadline to ask questions - Any questions or concerns should be submitted via ONLINE Substantial Completion - 610 calendar days Final Completion - 30 days of the designated or extended date of Substantial Completion Control: 0914-05-255 Pid- 2312-052-02/03
Bid Results
Roads / Highways
$25,197,028.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 15, 2025
October 14, 2025
Toro Grande Blvd, Cedar Park, TX
Related To This Project
Cedar Park, TX
--
Cedar Park, TX
Bid Date: Jan 17 2023
Cedar Park, TX
--
Cedar Park, TX
--
Cedar Park, TX
--
Cedar Park, TX
Bid Date: Jan 30 2023
Cedar Park, TX
--
Cedar Park, TX
--
Cedar Park, TX
--
Cedar Park, TX
--
Cedar Park, TX
--
Cedar Park, TX
Bid Date: Mar 29 2022
Cedar Park, TX
--
Cedar Park, TX
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
