BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 19, 2025

Site work and paving for a mixed-use development in Cedar Park, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

North Section - Reconstruction and widening of approx. 3,100 LF of Toro Grande Boulevard from RM 1431 (Whitestone Blvd) to New Hope Drive. This section includes completion of southbound lanes, removal of medians, relocation/replacement of street lights from the median to the shoulders, storm drain, water/wastewater, resurfacing of existing asphalt and pavement markings. Development of the southbound lanes to accommodate commercial development and maintain existing business access is a priority. South Section - New construction of approx. 1,600 LF of Toro Grande Boulevard from RM 1431 (Whitestone Blvd.) to a new roadway roundabout at "Commerce Street" and approx. 4,000 LF of "Commerce Street" connecting to FM 734 (Parmer Ln). This section includes a 4-lane divided roadway with raised medians, a bridge structure with aesthetic enhancements and overlooks over Brushy Creek, a new signalized intersection at Parmer Ln, streetlights, storm drain infrastructure, water/wastewater, shared use path/sidewalks, pedestrian connection to the Brushy Creek North Fork Trail, turn lane construction on FM 734 (Parmer Ln.) and reconfiguration on RM 1431 (Whitestone Blvd.), signal modification on RM 1431 (Whitestone Blvd.), asphalt paving, and pavement markings. Development of the section between RM 1431 (Whitestone Blvd.) and the bridge structure to accommodate commercial development is a priority. The estimated total base construction budget for this project is $29,275,000 and the not to exceed duration is 610 calendar days. Each PROPOSAL must be accompanied by Proposal Security made payable to OWNER in an amount of five percent (5%) of PROPOSER's total amount Proposal and in the form of a certified or cashier's check or a Bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions Question Deadline 08/08/2025 at 5:00 PM CT The deadline to ask questions - Any questions or concerns should be submitted via ONLINE Substantial Completion - 610 calendar days Final Completion - 30 days of the designated or extended date of Substantial Completion Control: 0914-05-255 Pid- 2312-052-02/03

Bid Results

Roads / Highways

$25,197,028.00

Public - City

Paving, Site Work

663

22

129

6

Subscribe For Documents

125 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
136
Bidding Soon
2,473
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.