BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Moreno Valley, California. Completed plans call for the renovation of a educational facility.

The deadline for requests for clarification is November 10, 2022 at 2:00 p.m. All Requests for Clarification must be sent to Carmen M. Ochoa, Purchasing Specialist at cmochoa@mvusd.net and Tanisha Grattan at tgrattan@mvusd.net Each bidder shall be a licensed B contractor pursuant to the California Business and Professions Code, and be licensed to perform the work called for in the Contract Documents. The successful bidder must possess a valid and active license as required at the time of award and throughout the duration of this Contract. The Contractor's California State License number shall be clearly stated on the bidder's proposal. Lease-Leaseback Contractor and Subcontractor Prequalification All Firms submitting a proposal to this RFP must be prequalified with the District pursuant to Public Contract Code section 20111.6 (b)-(m) without exception prior to submitting a proposal. Contractors currently prequalified with the District for lease-leaseback projects will not need to submit another prequalification package. Provide a copy of your current prequalification status letter from the District with your proposal. All mechanical, electrical or plumbing ("MEP") subcontractors (defined as contractors that hold a C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 license) must also be prequalified. This prequalification requirement applies even if the subcontractor will perform, or is designated and identified to perform, work that does not require one of the licenses listed above, but the subcontractor holds one of the licenses listed above. MEP subcontractors (as defined above) must be prequalified prior to the award of their respective subcontract. A list of prequalified MEP subcontractors will be made available by the District upon request, but not less than five business days prior to the proposal submission deadline. However, it is the responsibility of the Contractor to ensure that all MEP subcontractors holding any of the licenses listed above are properly prequalified. DIR Registration. Contractors and their subcontractors (of any tier) shall not be qualified to submit or be listed on a proposal, or engage in the performance of any contract for public work, as defined in the Labor Code, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered contractor to submit a proposal that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded. Prevailing Wages. The Contractor and all subcontractors shall comply with the requirements set forth in Division 2, Part 7, Chapter 1 of the Labor Code. Pursuant to Labor Code section 1770 et seq., the District has obtained from the Director of the Department of Industrial Relations the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in the locality in which this work is to be performed for each craft, classification or type of worker needed to execute the contract. Copies are available from the District to any interested party on request and are also available from the Director of the Department of Industrial Relations. The District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process and to be sole judge as to the merit, quality and acceptability of materials proposed. Bidder will take all necessary steps to avoid the appearance of conflict of interest and shall have a duty to disclose to the District prior to entering into an agreement any and all circumstances existing at such time, which pose a potential conflict. No bidder may withdraw any proposal for a period of one hundred and twenty (120) calendar days after the date set for the opening of proposals. Refer to the formal RFP documents for additional information, terms and conditions. The complete RFP documents and terms and conditions are considered one complete RFP component and cannot be altered in anyway.

Award

Educational

$500,000.00

Public - City

Renovation

117

27

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
96
Bidding Soon
2,142
All Active Projects
965
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2022

June 12, 2023

img_map_placeholder

26700 Cottonwood Ave, Moreno Valley, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.