Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 21, 2022 at 7:00 PM
Updated September 15, 2023
Site work for a water / sewer project in Checotah, Oklahoma. Completed plans call for site work for a water / sewer project.
Water main replacement 1 2,341.00 L.F 8" PVC C900 DR 18. The Notice to Bidders, Forms of bid, form fo contract, Plans and Specifications, Forms of Bid Bond,Performance and Statutory Payment,Bond, and other Contract Documents may be examined at the following: Performance, Maintenance and Statutory Payment Bonds in the amount of 100% of the contract price with a Corporate Surety licensed in Oklahoma and approved by the Owner and Engineer, will be required for the faithful performance of the contract. A Maintenance Bond guaranteeing the repair of all of McIntosh County, Oklahoma, by David Lee Henderson and Robert L. Henderson as Plaintiffs and you and each of you must answer said The time for completion of this project is 90 Calendar days. Bidders agree to pay as liquidated damages $1500.00 for each consecutive calendar day *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$1,100,735.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 11 - Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 30, 2022
December 30, 2022

Multiple Locations, Checotah, OK
Related To This Project
Checotah, OK
Bid Date: Dec 14 2022
Checotah, OK
Bid Date: Jun 08 2022
Checotah, OK
Bid Date: Dec 22 2022
Checotah, OK
Bid Date: Mar 17 2022
Checotah, OK
Bid Date: Mar 30 2022
Checotah, OK
Bid Date: May 12 2022
Checotah, OK
Bid Date: Apr 06 2022
Checotah, OK
Bid Date: Nov 08 2022
Oklahoma City, OK
--
Oklahoma City, OK
--
Tulsa, OK
Bid Date: Dec 12 2022
Kaw City, OK
Bid Date: Dec 08 2022
Tulsa, OK
Bid Date: Dec 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.