BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 15, 2022 at 7:00 PM

Updated November 26, 2025

Site work for a mixed-use development in Arnolds Park, Iowa. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

Site Directions: Pillsbury Point, West Lake Okoboji The restoration of four (4) historic stone benches, two (2) stone steps and one (1) wooden step. The work also includes tree/brush and vegetation removal and seeding of the lake bank. Project Category Code: Landscaping, Masonry Construction & Restoration, Landscaping (Tree and Shrub Clearing) START DATE: Project A - Spring 2023 Project B - Before April 1, 2023 or After September 30, 2023 BID SECURITY: 5% bid bond or security Est. Completion Date: June 15, 2024

Award

Playgrounds / Parks / Athletic Fields

$91,917.00

Public - City

Site Work

6

7

2

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
48
Bidding Soon
473
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2022

January 13, 2023

Project location map

23 Prairie Ln, Arnolds Park, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.