BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a playground / park / athletic field in Belmont, Ohio. Completed plans call for the renovation of a playground / park / athletic field.

Specifications: Request for installation overlay of 36 x 24 metal roof and drip edge on the Turnaround Shelter at Barkcamp State Park. See attached request for quote, sample contract, terms & conditions, standard affirmation & disclosure form, and OPERS independent contractor form. The standard affirmation & disclosure form is required to be uploaded with the bid. Installation: Contractor will measure and procure all material needed to install the new, brown metal roofs and drip edge at Barkcamp State park. The color will be chosen by Barkcamp State Park Manager. Contractor will flash and seal all roof penetrations and install step flashing around any chimneys and at all roof to wall joints. Contractor will utilize metal in valley. Flashing, drip edge & valley metal will be matched to the metal color. Contractor will remove and replace old, boxed vents Contractor will install solid ridge closures. General Requirements: Contractor will need to provide all tooling required to complete the job. Contractor shall secure and pay for all permits and fees, licenses, & inspections necessary for proper execution and completion of the work. Contractor will provide final cleaning. Conduct Cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State. Contract Award: The contract will be awarded to the lowest responsive and responsible bidder. MBE Set-aside in Accordance With ORC 125.081

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
62
Bidding Soon
872
All Active Projects
321
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2022

January 9, 2023

img_map_placeholder

65330 Barkcamp Park Rd, Belmont, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.