BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 10, 2026

Renovation of an educational facility in San Antonio, Texas. Completed plans call for the renovation of a 3,600-square-foot educational facility.

The Wagner High School Welding Shop is a simple and efficiently designed and constructed fast-track project that utilized an existing JOC contract and the Design-Build delivery method. The Design-Build delivery method ensured a streamlined process from conception to completion, with a single point of contact throughout the process. The RVK/Marksmen GC team came together with a clear mission, design and build a welding shop in the least amount of time possible. The project consisted of a pre-engineered steel frame with highquality metal panel cladding and roofing system. The building was designed to meet the client's specific needs, including large clearspan space and high ceilings to accommodate welding equipment, materials storage, and exhaust systems. Additionally, the project included necessary mechanical and electrical systems, including heating, ventilation, and air conditioning (HVAC), plumbing, and electrical wiring. The building's lighting was designed to provide ample illumination for students and teachers to ensure safety in a hands-on learning environment. The extremely long lead time of the electrical switchgear prevented "power-on" in the facility for four months despite the otherwise complete building. The Design-Build delivery method ensured effective communication between the design and construction teams, minimizing most project delays or potential errors. ? This project is part of the school district’s bond that passed. As of June 9, 2026, further details regarding firm construction and completion timelines have not been disclosed. This project receives automated updates from sources only and will not be actively tracked by our Content team. Information is provided as-is for planning awareness. Should you wish to provide information on this project or are seeking an update, please email contentcase@constructconnect.com

Under Construction

Educational

$1,150,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
114
Bidding Soon
2,844
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2022

Project location map

3000 N Foster Rd, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.