EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 26, 2023 at 7:00 PM

Updated January 25, 2024

Site work and paving for a mixed-use development in Crestwood, Kentucky. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

Project Description: Project scope occurs at (4) Elementary Schools: Kenwood Station Elementary School, Buckner Elementary School, Camden Station Elementary School, and Centerfield Elementary School. Site improvements for drainage and ADA Accessibility include concrete walks, re-grading of areas in and around playgrounds, accessible pathways between play areas, storm structures, and diverting stormwater via ditches and swales. New shade structures adjacent to playground areas for covered and shaded instruction purposes and playground supervision. Addenda: The last date for the Architect to receive items to be addressed in any addenda is November 30, 2022 by 12:00 p.m. EST. All requests must be submitted to the Architect in writing Additional Doc Acq. Note: It is most important that requesting firm identify the position of the firm as to prime bidder, miscellaneous Contractor, material supplier, or other. Please give name, address, telephone number and email address of person responsible for receiving Addenda material and general communication concerning this bidding. General Information: State Wage Rates are not applicable. Conflicts of interest, gratuities and kickbacks are defined in KRS 45A.445 and as provided for in KRS 45A.455 are absolutely prohibited. Preference for resident bidders shall be given as outlined in KRS 45A.90 to 45A.94. The successful bidder must supply a 100% Performance and Payment Bond as outlined in the Project Manual. Method of Receiving Bids: Bids will be received from Contractors for a Total Lump Sum Amount. All phases of the work shall be bid to and through the Contractor submitting the proposal. Bid Security in the amount of five (5) percent of each proposal submitted must accompany each Proposal in accordance with the Form of Proposal. The Owner reserves the right to accept any bid, to reject any or all bids, to waive any informalities in bids received where such acceptance, rejection, or waiver is considered to be in the best interest of the Owner or to reject any bid where evidence or information submitted by the bidder does not satisfy the Owner that the bidder is qualified to carry out the details of the Contract Documents. Project Locations: Kenwood Station Elementary School, 6321 Veterans Memorial Parkway, Crestwood, Kentucky 40014 Buckner Elementary School, 1240 Colonel Drive, Buckner, Kentucky 40010 Camden Station Elementary School, 6401 KY-146, Crestwood, Kentucky 40014 Centerfield Elementary School, 4512 Centerfield Drive, Crestwood, Kentucky 40014

Award

Playgrounds / Parks / Athletic Fields

$530,000.00

Public - County

Paving, Site Work

16

13

8

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, References, Reference Standards, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Finishing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Railings
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds, Other Furnishings, Site Furnishings
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Mowing, Pruning, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Unit Paving, Athletic and Recreational Surfacing, Site Improvements, Retaining Walls, Irrigation, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
62
Bidding Soon
1,199
All Active Projects
540
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

January 16, 2023

img_map_placeholder

Multiple Locations, Crestwood, KY

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Oldham County Elementaries: Site & Access Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.